DVP TDC 150 Скачать руководство пользователя страница 2

 

 

User and maintenance manual

 

EN

 

TSC - TDC

 

 

 

1

 

 

8702040 – 14/01/2019 – R.7 

www.dvp.it 

 

 

INDEX

 

1

 

INTRODUCTION..................................................................................................................................................2

 

1.1 

GENERAL

 

INFORMATION ...........................................................................................................................2 

1.2 

MANUFACTURER

 

DATA ..............................................................................................................................2 

1.3 

CONSULTATION

 

METHODS .......................................................................................................................2 

1.4 

PERSONNEL

 

QUALIFICATIONS .................................................................................................................2 

1.5 

PERSONAL

 

PROTECTION

 

EQUIPMENT ....................................................................................................3 

1.6 

IDENTIFICATION

 

PLATE ..............................................................................................................................3 

2

 

SAFETY ...............................................................................................................................................................4

 

2.1 

GENERAL

 

WARNINGS .................................................................................................................................4 

2.2 

ADDITIONAL

 

RISKS .....................................................................................................................................4 

2.3 

PICTOGRAMS ..............................................................................................................................................5 

3

 

TURBINE DESCRIPTION ...................................................................................................................................6

 

3.1 

INTENTED

 

USE

 

AND

 

CONTRAINDICATIONS ............................................................................................6 

3.1.1 

INTENTED USE ......................................................................................................................................6 

3.1.2 

CONTRAINDICATIONS ..........................................................................................................................6 

3.2 

NOISE

 

EMISSIONS .......................................................................................................................................6 

3.3 

DIMENSIONS

 

AND

 

SPECIFICATIONS ........................................................................................................7 

3.3.1 

TSC Models ............................................................................................................................................7 

3.3.2 

TDC Models ......................................................................................................................................... 10 

4

 

INSTALLATION ................................................................................................................................................ 13

 

4.1 

CONTENT

 

RECEPTION

 

AND

 

CONTROL ................................................................................................. 13 

4.2 

PACKAGING .............................................................................................................................................. 13 

4.3 

TRANSPORT

 

AND

 

HANDLING ................................................................................................................. 13 

4.4 

STORAGE .................................................................................................................................................. 13 

4.5 

ENVIRONMENTAL

 

CONDITIONS ............................................................................................................. 13 

4.6 

TURBINE

 

INSTALLATION ......................................................................................................................... 14 

4.7 

USER

 

SYSTEM .......................................................................................................................................... 14 

4.8 

CONNECTION ........................................................................................................................................... 14 

4.8.1 

INTAKE AND OUTLET CONNECTION ............................................................................................... 15 

4.8.2 

ELECTRIC CONNECTION .................................................................................................................. 15 

5

 

INSTRUCTIONS FOR USE .............................................................................................................................. 17

 

5.1 

OPERATION .............................................................................................................................................. 17 

5.2 

START-UP .................................................................................................................................................. 17 

5.3 

STOP .......................................................................................................................................................... 18 

5.4 

DECOMMISSIONING

 

AND

 

PROLONGED

 

STOPPAGE ........................................................................... 18 

6

 

MAINTENANCE................................................................................................................................................ 19

 

6.1 

GENERAL

 

WARNINGS .............................................................................................................................. 19 

6.2 

INTERVENTION

 

TABLE............................................................................................................................. 20 

6.2.1 

INTAKE FILTER CONTROL ................................................................................................................ 20 

6.2.2 

REPLACING THE INTAKE FILTER .................................................................................................... 20 

6.2.3 

CLEANING THE MOTOR FAN PROTECTION ................................................................................... 20 

6.2.4 

GENERAL EXTERNAL CLEANING OF THE TURBINE ..................................................................... 20 

6.2.5 

CHECKING THE OPERATION OF VACUUM AND/OR PRESSURE REDUCING VALVES ............. 20 

6.2.6 

CLEANING THE INTAKE AND OUTLET SILENCERS ....................................................................... 21 

6.2.7 

GREASING THE BEARINGS .............................................................................................................. 21 

6.2.8 

BEARING REPLACEMENT ................................................................................................................. 21 

6.3 

SPARE

 

PARTS ........................................................................................................................................... 21 

7

 

RETURNING THE PRODUCT .......................................................................................................................... 21

 

8

 

DISMANTLING ................................................................................................................................................. 22

 

9

 

TROUBLESHOOTING ..................................................................................................................................... 22

 

 

 

 

Содержание TDC 150

Страница 1: ...VACUUM TECHNOLOGY OPERATING AND MAINT ENANCE INSTRUCTIONS Translation of the original instructions SIDE CHANNEL BLOWERS TSC TDC...

Страница 2: ...4 3 TRANSPORT AND HANDLING 13 4 4 STORAGE 13 4 5 ENVIRONMENTAL CONDITIONS 13 4 6 TURBINE INSTALLATION 14 4 7 USER SYSTEM 14 4 8 CONNECTION 14 4 8 1 INTAKE AND OUTLET CONNECTION 15 4 8 2 ELECTRIC CONN...

Страница 3: ...5118897101 Fx 3905118897170 e mail info dvp it web site http www dvp it Please always include the following information in all communications regarding the turbine turbine model and serial number year...

Страница 4: ...y safety requirements in particular it is mandatory that personnel are equipped with personal protective equipment in relation to the activities that must be performed 1 6 IDENTIFICATION PLATE The sid...

Страница 5: ...ke and outlet silencers it is possible to access the rotating rotor Never insert your hands or any kind of object through the openings This hazard also exists when the machine is not moving when it is...

Страница 6: ...n of the side channel turbine in order to avoid those in charge of works being directly hit by parts or bits of parts flying through the fan cover casing due to the cooling fan breaking 2 3 PICTOGRAMS...

Страница 7: ...s other than those indicated in the tables shown in point 3 3 of this manual Do not use the turbine in an explosive or aggressive atmosphere or in an atmosphere with a high concentration of dust or oi...

Страница 8: ...115 175 1 1 2 G 284 273 285 0 TSC 210 260 298 115 195 123 250 M8 4 47 175 339 14 120 200 2 G 320 322 332 0 TSC 310 290 332 140 180 113 250 M8 5 50 195 382 14 125 240 2 G 370 362 383 0 TSC 310 1 290 3...

Страница 9: ...EN ISO 2151 K 3dB dB A 50Hz dB A 60Hz 52 55 58 61 63 64 70 73 52 55 58 61 63 64 64 65 64 65 Weight kg 7 12 18 27 5 7 12 17 5 19 19 Intake Outlet G 1 1 1 4 1 1 2 2 1 1 1 4 1 1 2 1 1 2 1 1 2 Required w...

Страница 10: ...78 74 79 76 81 76 81 Weight kg 26 5 37 5 40 41 83 5 83 5 90 122 133 Intake Outlet G 2 2 2 2 2 1 2 2 1 2 2 1 2 4 4 Required workplace temperature C 0 40 Storage transport room temperature C 20 50 MAX...

Страница 11: ...13 79 250 M8 5 50 195 TDC 310 1 290 332 140 180 252 252 218 250 M8 5 98 195 TDC 550 365 420 280 315 307 193 139 350 M12 30 96 280 TDC 550 1 365 420 280 315 307 308 254 350 M12 30 121 280 MODEL H2 HT L...

Страница 12: ...A 50Hz dB A 60Hz 60 66 66 69 60 66 66 69 66 69 Weight kg 18 31 18 30 32 5 Intake Outlet G 1 1 4 1 1 2 1 1 4 1 1 2 1 1 2 Required workplace temperature C 0 40 Storage transport room temperature C 20 50...

Страница 13: ...0 600 Noise level UNI EN ISO 2151 K 3dB dB A 50Hz dB A 60Hz 74 77 74 77 75 79 75 79 76 81 76 81 Weight kg 43 5 45 56 58 120 149 Intake Outlet G 2 2 2 2 2 1 2 2 1 2 Required workplace temperature C 0 4...

Страница 14: ...handling operation must be performed by qualified and experienced personnel It is strictly forbidden to lift the turbine in any way other than that foreseen The side channel turbine can be raised and...

Страница 15: ...ironmental conditions or causing discomfort to personnel In order to avoid vacuum or overpressure excesses fit an intake or compression outlet safety valve that allows you to comply with the levels sh...

Страница 16: ...are not transmitted on the turbine s attachments WARNING Use an intake filter especially if the turbine works with unclean air flows 4 8 2 ELECTRIC CONNECTION WARNING Check that voltage and frequency...

Страница 17: ...e the electric connection box as shown on the side Heat protector specifications NC contact type Intervention temperature 130 5 C Electric contact flow 250Vac 1 A Heat protector connection layout 1 Co...

Страница 18: ...ors and or protections and or closure valves Check that the adjustment of the motor protection corresponds with the motor s nominal current indicated on the relative plate Check the correct functionin...

Страница 19: ...the power supply to the motor If the turbine is to be turned off let it run with the intake open for about 30 minutes first This will eliminate any moisture inside the intake chamber and avoid the oxi...

Страница 20: ...ual HAZARD All maintenance work must be carried out with the turbine disconnected from the power supply and measures must be adopted to prevent it being reconnected Only open the terminal board after...

Страница 21: ...y cloth for the container while for the cartridge blowing compressed air aimed in the opposite direction to the conveyed flow s filtering direction that is from the inside outwards Do not use fluids o...

Страница 22: ...below you will need to grease the rolling bearings again on the side channel impeller Favourable storage conditions see point 3 3 of this manual 4 years Unfavourable storage conditions high humidity...

Страница 23: ...r winding Contact Service Department Intervention of the electric motor protection system The electric motor s protection fuses burn The current absorbed by the electric motor is too high The electric...

Страница 24: ...User and maintenance manual EN TSC TDC 23 8702040 14 01 2019 R 7 www dvp it...

Страница 25: ...User and maintenance manual EN TSC TDC 24 8702040 14 01 2019 R 7 www dvp it...

Страница 26: ...t appear to be faulty due to negligence and or carelessness during use failure to observe the equipment operating instructions lack of maintenance incorrect installation and or maintenance maintenance...

Страница 27: ...Cod 8702040 14 01 2019 R 7 EN D V P Vacuum Technology s p a Via Rubizzano 627 40018 San Pietro in Casale BO Italy Ph 3905118897101 Fx 3905118897170 www dvp it...

Отзывы: