![DURAVANT QC Conveyors AS40 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/duravant/qc-conveyors-as40/qc-conveyors-as40_installation-operation-and-maintenance_2541742009.webp)
qcconveyors.com
Side/Guide installation — Installing Fixed Side Rails | 9
Installing Fixed Side Rails
CARET-LEFT
SIDE/GUIDE INSTALLATION
Insert drop in nuts into
t-slot on frame.
1
Tighten screws in
clamping blocks.
2
x
9
Align guide brackets with
drop in nuts.
2
Tighten screws in guide
clamps.
10
Insert socket head cap
screw through guide
clamp and into drop in nuts.
3
Re-tighten screws in
tracking block.
2
x
11
Insert two drop in nuts
into t-slot at tail end of
frame.
2
x
4
Align clamping block to
drop in nuts.
5
Insert screws through
clamping block and into
drop in nuts.
2
x
6
Loosen tracking block
screws. (Do not remove)
2
x
7
Slide guide rail in
between clamps and
frame until in place.
8