![DURAVANT QC Conveyors AS40 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/duravant/qc-conveyors-as40/qc-conveyors-as40_installation-operation-and-maintenance_2541742004.webp)
4 | Checking Shipment and General Information — Installation
AS40 Manual
General Sequence of Installation
Check Your Shipment
Assistance
CARET-LEFT
CARET-LEFT
INSTALLATION
CARET-LEFT
Before opening the shipment, visually inspect the outside of the crate/box for shipping damage. Carefully unpack the crate/box, inspecting
for component damage which may have occurred inside the packing materials. Contact the carrier and QC Conveyors regarding any
damage that may have occurred during shipment. Check the contents of your shipment against the supplied packing slip and inform QC
Conveyors of any discrepancies.
If you need assistance, please contact QC Conveyors customer service department Monday through Friday, 8am-5pm EST at (513)
753-6000. In addition, your local distributor has been trained at the factory and can provide support in many ways. You can also visit
our website — qcconveyors.com — for additional information and technical documents.
Lag conveyor to floor/
Engage caster locks and
inspect conveyor before use.
4
Install drive motor and
mounting package.
3
Attach sides, guides or
underside idlers to
conveyor and adjust as needed.
2
Mount conveyor to stands
or mounting brackets;
install angle brackets if appropriate.
In applications with three stands,
install angle braces only on outer-
most stands.
1