![DURAVANT QC Conveyors AS40 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/duravant/qc-conveyors-as40/qc-conveyors-as40_installation-operation-and-maintenance_2541742007.webp)
qcconveyors.com
Stand Installation — Mounting Angle Braces | 7
Mounting Angle Braces
CARET-LEFT
STAND INSTALLATION
Insert drop in nut into
inner stand leg t-slot.
1
Insert drop in nut into
conveyor frame’s t-slot.
2
Align angle brace over
drop in nut in stand.
3
Insert socket head cap
screw through angle brace
and into drop in nut on stand (do
not fully tighten).
4
Slide up and align angle
brace with drop in nut in
frame.
5
Insert socket head cap
screws through angle
brace and into drop in nut in the
conveyor frame.
6
Tighten socket head cap
screw on frame.
7
Tighten socket head cap
screw on stand.
8
Check with bubble level to
ensure conveyor is level.
Repeat all steps for opposite side
9
Warning: Use caution when moving a conveyor with casters.
Moving conveyors with casters can create dynamic forces that could tip the conveyor.
Injury is possible if the stands are not lagged to the floor, cross ties are not used, or angle braces are not present. Never place a conveyor in operation
until all proper mounts are installed and secured.
Exclamation-Triangle