background image

10 

Step 4:

  Slide the latch on to the handle shaft. Enter shed, 

close door and adjust latch so it is snug with the stud 
at the side of the door. Tighten up bolt on latch. 

Note: Repeat Step 4 for second door handle if double security doors.

 

FORTRESS SECURITY DOOR (Optional) 

Step 1:

  Place shed in final position. Check diagonal meas-

urements are equal and shed is level before fitting 
door. 

Step  2:   

Hold Door in 

position  (approximately 
5mm  down  from  Top 
Plate  Flashing)  and  fit 
one  rivet  to  top  hinge. 
While  still  holding  in 
position  fit  one  rivet  to 
bottom hinge. 

Step 3: 

Close door and check it fits correctly. If 

not, drill out rivets and make necessary adjust-
ments. Fit remaining rivets to all three hinges. 

Содержание TUF 500

Страница 1: ...Quality Made Affordable ASSEMBLY INSTRUCTIONS TUF 500 BASE SIZE 1980mm x 1690mm...

Страница 2: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools w...

Страница 3: ...ROOF SIZE 2 010 x 1 890 TUF 500 PARTS LIST 1 2 Wall Sheets TIMBER Wall Sheets Corner Wall Sheets Door DESCRIPTION Clear Roof Panel 3 4 Front Wall Sheet D008 Back Wall Nog Front Right Nog End Wall Nogs...

Страница 4: ...te 70x45mm Step 3 Position remaining End Frame on top of plates While someone sup ports frame nail in place using two 75mm nails per join Step 4 Carefully roll frame over onto its base Nail on Back an...

Страница 5: ...Door Jambs Position left hand Door Jamb Flashing at correct measurement from left cladding detail and nail to Top Plate using a 30mm clout Do not fit 50mm nails at this stage Pre drill holes to make n...

Страница 6: ...doorway Rivet to Corner Wall Sheet one rivet top and bottom Posi tion and rivet in place all remaining Wall Sheets ensuring they overlap correctly While holding Front Wall Sheets up against Top Plate...

Страница 7: ...g paper will need to be supported by netting or roofing twine Standard Roof Position Roof Sheets as shown in fig 1 Make sure sheet joins at the back are flush Riv et sheet joins one rivet 200mm back f...

Страница 8: ...op End Plates and nail in place using a 30mm clout each end fig 3 Position Roof Sheets as shown in fig 1 When fitting Clear Panel ensure it OVERLAPS Roof Sheets Rivet sheet joins one rivet 200mm from...

Страница 9: ...late Flashing and fit one rivet to top hinge While still holding in position fit one rivet to bottom hinge Step 3 Close door and check it fits correctly If not drill out rivets and make necessary adju...

Страница 10: ...URITY DOOR Optional Step 1 Place shed in final position Check diagonal meas urements are equal and shed is level before fitting door Step 2 Hold Door in position approximately 5mm down from Top Plate...

Страница 11: ...ll Sheets will then protrude 20mm below the Base Plate This will stop water flowing in between the Base Plate and Floor If you choose this option the Floor should be made 15mm smaller than Base Size N...

Страница 12: ...in most environments The surface must be dry and free of dirt oil grease and other contaminants prior to painting but no weathering of the surface is required Zinc rich primers are recommended for us...

Страница 13: ...nd very severe environmental situations or in any area where the mild steel corrosion rate as published by BRANZ exceeds 200g m2 3 Minimum maintenance must be carried out in accordance with instructio...

Отзывы: