Note:

  For  sheds  being  positioned  on  a  Purpose  Built  Floor,  shorten  Studs 

by 30mm now (Refer to Floor Section). 

Step 1:

  Select  one  End  Base  Plate  1.690m  (Green),  one  End  Top  Plate 

1.690m (Red) and two Studs (Yellow). Lay out on flat surface and nail 
together using two 75mm nails per join 

(fig.  1)

. Repeat with the other 

end frame. 

Step 2:

  Select Back and Front Base Plates 1.980m (Green), Back Top Plate 

1.980m (Red) and Front Top Plate (70x45mm). With one End Frame 
lying  on  the  ground,  nail  plates  to  frame,  two  75mm  nails  per  join. 
Ensure  Green  joins  to  Green  and  Red  joins  to  Red.  See 

(fig.  2)

  for 

nailing detail on Top Front Plate (70x45mm). 

Step 3:

  Position remaining End Frame on top of plates. While someone sup-

ports frame, nail in place using two 75mm nails per join. 

Step 4:

  Carefully  roll  frame  over  onto  its  base.  Nail  on  Back  and  End  Wall 

Nogs  .882m  above  the  top  of  the  Bottom  plate.  If  fitting  a  Duratuf 
Floor, fit Floor Joists now. Evenly space joists and nail in place using 
three  75mm  nails  per  end.  Nail  Front  wall  Studs  (Blue)  using  Front 
Wall Nogs to get correct position, Nail remaining Front  Wall Nogs in 
centrally (this may be easier if the frame is rolled onto its Front wall). 

Step 5:

  Fit  front  Top  Plate  Flashing  centrally  on  Front  Top  Plate  using  four 

30mm Clouts. Position Flashing so that the widest lip is on top. 

TUF 500 TIMBER FRAME 

fig. 1 

fig. 2 

YEL

L

O

W

 

B

L

U

E

 

YEL

L

O

W

 

YEL

L

O

W

 

1.8

10

 

YEL

L

O

W

 

B

L

U

E

 

Top Plate 
Flashing 

Содержание TUF 500

Страница 1: ...Quality Made Affordable ASSEMBLY INSTRUCTIONS TUF 500 BASE SIZE 1980mm x 1690mm...

Страница 2: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools w...

Страница 3: ...ROOF SIZE 2 010 x 1 890 TUF 500 PARTS LIST 1 2 Wall Sheets TIMBER Wall Sheets Corner Wall Sheets Door DESCRIPTION Clear Roof Panel 3 4 Front Wall Sheet D008 Back Wall Nog Front Right Nog End Wall Nogs...

Страница 4: ...te 70x45mm Step 3 Position remaining End Frame on top of plates While someone sup ports frame nail in place using two 75mm nails per join Step 4 Carefully roll frame over onto its base Nail on Back an...

Страница 5: ...Door Jambs Position left hand Door Jamb Flashing at correct measurement from left cladding detail and nail to Top Plate using a 30mm clout Do not fit 50mm nails at this stage Pre drill holes to make n...

Страница 6: ...doorway Rivet to Corner Wall Sheet one rivet top and bottom Posi tion and rivet in place all remaining Wall Sheets ensuring they overlap correctly While holding Front Wall Sheets up against Top Plate...

Страница 7: ...g paper will need to be supported by netting or roofing twine Standard Roof Position Roof Sheets as shown in fig 1 Make sure sheet joins at the back are flush Riv et sheet joins one rivet 200mm back f...

Страница 8: ...op End Plates and nail in place using a 30mm clout each end fig 3 Position Roof Sheets as shown in fig 1 When fitting Clear Panel ensure it OVERLAPS Roof Sheets Rivet sheet joins one rivet 200mm from...

Страница 9: ...late Flashing and fit one rivet to top hinge While still holding in position fit one rivet to bottom hinge Step 3 Close door and check it fits correctly If not drill out rivets and make necessary adju...

Страница 10: ...URITY DOOR Optional Step 1 Place shed in final position Check diagonal meas urements are equal and shed is level before fitting door Step 2 Hold Door in position approximately 5mm down from Top Plate...

Страница 11: ...ll Sheets will then protrude 20mm below the Base Plate This will stop water flowing in between the Base Plate and Floor If you choose this option the Floor should be made 15mm smaller than Base Size N...

Страница 12: ...in most environments The surface must be dry and free of dirt oil grease and other contaminants prior to painting but no weathering of the surface is required Zinc rich primers are recommended for us...

Страница 13: ...nd very severe environmental situations or in any area where the mild steel corrosion rate as published by BRANZ exceeds 200g m2 3 Minimum maintenance must be carried out in accordance with instructio...