background image

 

 

 

 

Riverlea Group Ltd warrant that the cladding used in the manufacture of the Guardian shed will not rust within 20 years from the 

date of purchase.

 

 

 

Any liability for product failure that may arise will be limited to repair or replacement of the defective product and will only apply for 

the benefit of the original purchaser. Riverlea Group Limited will not be liable for any consequential loss or damage, labour, or 

transport charges.

 

 

 

This warranty is conditional on:

 

• 

Construction, installation and maintenance being carried out as specified in the Assembly Instruction Manual.

 

• 

The shed being installed in modest inland corrosion zones or areas where the steel corrosion rate is less than 200g/m2          
(as published by Branz).

 

• 

Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase. 

 

 

 

This warranty does not cover the following:

 

• 

Fastenings and fixings.

 

• 

Normal wear and tear, damage by impact or acts of God.

 

• 

Situations where the shed has been used for storage of chemicals, manure or corrosion causing products.

 

• 

Unauthorized modification of the structure, including painting of the cladding.

 

 

Please visit http://www.riverleagroup.co.nz/warranty

-

garden

-

sheds to validate the Warranty on your shed.

 

Click on the Warranty Registration Link and complete all details.

 

 

If you are unable to access the computer, please phone us on 0800 438 274 and one of the customer services team 

will help you to activate the warranty on your garden shed. 

 

 

 

Many thanks, from the Team at Riverlea Group.

 

20 YEAR WARRANTY

 

WARRANTY REGISTRATION

 

Содержание Gurdian Sheds GG101

Страница 1: ...ASSEMBLY INSTRUCTIONS GG101 BASE SIZE 3 190m x 3 020m...

Страница 2: ......

Страница 3: ...process needs to be adhered to to qualify for the steel warranty of your Duratuf Guardian shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as...

Страница 4: ...1 920m 4 Side Wall Angle 1 980m 4 Side Wall Angle 2 040m 4 Roof 1 600m 12 Roof 1 Pan 1 600m 2 Door Sheet Narrow 1 850m 3 Door Sides 1 850m 4 Door Jamb 1 890m 2 Door Brace 1 160m 2 Door Brace 0 915 2...

Страница 5: ...CRIPTION QTY DIAGRAM CHECKED Front Back Bottom Plates H4 Green 3 190 m 2 Front Back Top Plate H1 Red 3 190 m 2 Side Wall Bottom Plates H4 Green 3 020 m 2 Side Wall Top Plates H1 Red 3 020 m 2 Ridge Be...

Страница 6: ...Top Plate Side Top Plate Front Bottom Plate Front Bottom Plate Side Back Wall Sheets 6 Sheets 1 x 1Pan Sheet Front Wall Sheets 1 Sheet 1 x 1Pan Sheet Door Jambs Front Wall Sheet x 2 Door Side Flashing...

Страница 7: ...hrough from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom plat...

Страница 8: ...g 1 STEP 4 On the back of the door place door braces in posi tion as shown in fig 4 Ensure that the top and bottom ends of the braces are under the door flashings as shown in fig 5 and opposite ends o...

Страница 9: ...e wall sheet overhang the Top Plate by approx 15mm as shown Check that the Top Plate is straight then nail the Wall sheet to the Top Plate 2 clouts per pan see fig 1 Standard Shed Bottom Plate will pr...

Страница 10: ...wall sheets to the Top Plate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and tha...

Страница 11: ...by 15mm as shown Nail wall sheets to Top Plate two clouts per pan Nail the wall sheets to the Bottom Plate making sure that the Plates are the correct distance apart and that the sides of the wall sh...

Страница 12: ...2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front...

Страница 13: ...90 m Ridge Beam 2 x 0 200 m Jack Studs 8 x 75mm Screws 36 x 50mm Roofing Screws 74 x Rivets 44 x 50mm Clouts 12 JACK STUD TOP PLATE RIDGE BEAM fig 1 fig 2 STEP 2 Position the first Roof Sheet so that...

Страница 14: ...l holes using a 3 5mm drill bit Use Roofing Screws on all other ribs and pans Ensuring screws are not overtightened as this can damage the seal and cause the shed to leak fig 1 SIDE WALL FRONT WALL BA...

Страница 15: ...h end with two 75mm nails Check that the shed is sitting level and square Check that the diagonal Bottom Plate measurements are the same This ensures that the shed base is square Place the Floor Board...

Страница 16: ...less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Faste...

Отзывы: