background image

DURATUF PREMIUM SHED WARRANTY

 

GUARANTEE TO CUSTOMER

 

Congratulations on purchasing a Duratuf Storage Shed. With proper care and attention, this product will last many years.

 

For your benefit 

PLEASE READ THE FOLLOWING INFORMATION CAREFULLY.

 

 

WARRANTY ON METAL CLADDING

 

Riverlea Group Ltd guarantee that the metal roofing and wall cladding on Kiwi and Fortress Garden Sheds may be used in moderate and 
inland corrosion zones or areas where the first year mild steel corrosion rate is less than 200g/m2, and that in these conditions, they will 
not perforate due to corrosion within 30 years of date of manufacture.

 

 

TERMS AND CONDITIONS

 

1.

 

Damage or corrosion due to the following circumstances is not covered by this warranty.

 

 

Mechanical, chemical or other damage sustained during or after installation.

 

 

 

   

NOTE: 

Clean swarf off shed 

IMMEDIATELY

 after assembly

 

 

 

   Do 

NOT 

mark cladding with pencil

 

 

 

   Do 

NOT 

allow manures, chemicals or other corrosive materials to have direct contact with cladding

 

 

 

   Chemical damage will result if these instructions are not carried out

 

 

Force majeure or other causes beyond the control of Riverlea Group Ltd.

 

 

2.

 

This warranty does not cover material installed in severe and very severe environmental situations, or in any area where the mild 
steel corrosion rate (as published by BRANZ) exceeds 200g/m2.

 

Please visit www.duratuf.co.nz/warranty to validate the Warranty on your shed.

 

Click on the Warranty Registration Link and complete all details.

 

If you are unable to access the computer, please phone us on 0800 438 274 and one of the customer services team will help you to acti-
vate the warranty on your garden shed.

 

 

Many thanks, from the Team at Riverlea Group.

 

WARRANTY REGISTRATION

 

Содержание SHEDS KS1

Страница 1: ...Quality Built In ASSEMBLY INSTRUCTIONS KS1 BASE SIZE 1715mm x 876mm...

Страница 2: ...structions Keith s practical tips and tricks will make your assembly experience that much simpler giving you visual guidance through sections that seem tricky on paper and help you achieve a flawless...

Страница 3: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools wi...

Страница 4: ...0 603m 0 588 x 0 150m 1 Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Window Hardware Pack 1 016m Clear Roof Panel Security Single Door Hardware Pack Alarm MA20 Shed light Bolt Down...

Страница 5: ...KS1 TIMBER FRAME 5 1900 or 1870 for Raised Base Plate only 1 810 YELLOW YELLOW YELLOW YELLOW YELLOW 45 45 0 786 0 876 45 45 45 END WALL 883 45 45 795 1715 90 45 45 FRONT WALL 883 45 785...

Страница 6: ...with other end wall Step 3 Select one 1 715m Base Plate Green and one 1 715m Top Plate 45 x 45 Nail in place Ensure Green joins to Green Step 4 Carefully roll the frame over so that the Ridge Beam and...

Страница 7: ...el Use either crayon or ink to mark steel TERMS EXPLANATION To Tack To Tack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be...

Страница 8: ...he Top Plates and Bottom Plates Nail Wall Sheets to mid wall Nogs one per pan Nail each corner Wall Sheet to Studs using two 30mm Clouts evenly spaced Step 3 End Walls Position wall sheet with the LIP...

Страница 9: ...Lay out the two window studs 883mm and Nog 634mm on a flat surface Position Nog and nail in place using 2x 75mm nails at each end Step 6 From the inside of the shed slide Louvre Glass into Louvre Uni...

Страница 10: ...amb Step3 Measure and cut Doorstep Flashing 106 to fit in between Door Jambs Position the Doorstep Flash ing in between the Door Jambs at bottom of door way nail through top of flashing using three 30...

Страница 11: ...ll a hole in right hand end of track 45mm in from outside edge of Corner Flashing Predrill hole in left hand end of track 45mm from outside of door jamb 60mm for Security door option Screw door stops...

Страница 12: ...it may be necessary to temporarily brace the shed with pieces of timber from the packaging Step 3 Position Roof Sheets They should overhang the back top plate by 20mm Ensure timber plates are straight...

Страница 13: ...Position Spouting at the front of the roof ensuring that the ends are flush with the End of the Barge flashings Rivet spout ing onto the Roof at every second Rib Use 2 rivets per end and rivet into Ba...

Страница 14: ...a Floor Board on top of Bottom Plates and Joist and push up against end wall Mark out where Studs are Cut checkouts with Electric Jigsaw so Floor Board will fit around Studs Step 3 Re position Floor...

Страница 15: ...Note See below for security option 15 SECURITY DOOR Optional Step 2 Once door is hung position the Locking Stays so they slide into the Locking Brackets easily Screw Locking Stays to Door Jamb Step 1...

Страница 16: ...lthough it is not essential fitting Damp Proof Course in between the Base Plate and the Floor will give add ed protection against moisture CLEAN UP Remove all swarf drill filings with a soft brush or...

Страница 17: ...e to hear about your Duratuf experience and why you chose us Further to that we would also love to see a picture or a short video of your shed installed and doing its job so that we can share this wit...

Страница 18: ...damage sustained during or after installation NOTE Clean swarf off shed IMMEDIATELY after assembly Do NOT mark cladding with pencil Do NOT allow manures chemicals or other corrosive materials to have...

Отзывы: