background image

KS1 HASP & STAPLE

 

Using six rivets and one 50mm clout 
attach hasp to Door Jamb Flashing and 
the staple to the Door as shown.

 

(Note: See below for security 

 

option.)

 

15

 

SECURITY DOOR

 

(Optional)

 

Step 2:

 

Once door is hung, position the Locking Stays so 
they slide into the Locking Brackets easily. Screw 
Locking Stays to Door Jamb.

 

Step 1:  

Attach 

“ 

T

” 

locking handle with two 8x10mm 

screws. Slide hook onto square shaft and 
secure with a lock washer.

 

Hook 

Lock Washer 

Содержание SHEDS KS1

Страница 1: ...Quality Built In ASSEMBLY INSTRUCTIONS KS1 BASE SIZE 1715mm x 876mm...

Страница 2: ...structions Keith s practical tips and tricks will make your assembly experience that much simpler giving you visual guidance through sections that seem tricky on paper and help you achieve a flawless...

Страница 3: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools wi...

Страница 4: ...0 603m 0 588 x 0 150m 1 Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Window Hardware Pack 1 016m Clear Roof Panel Security Single Door Hardware Pack Alarm MA20 Shed light Bolt Down...

Страница 5: ...KS1 TIMBER FRAME 5 1900 or 1870 for Raised Base Plate only 1 810 YELLOW YELLOW YELLOW YELLOW YELLOW 45 45 0 786 0 876 45 45 45 END WALL 883 45 45 795 1715 90 45 45 FRONT WALL 883 45 785...

Страница 6: ...with other end wall Step 3 Select one 1 715m Base Plate Green and one 1 715m Top Plate 45 x 45 Nail in place Ensure Green joins to Green Step 4 Carefully roll the frame over so that the Ridge Beam and...

Страница 7: ...el Use either crayon or ink to mark steel TERMS EXPLANATION To Tack To Tack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be...

Страница 8: ...he Top Plates and Bottom Plates Nail Wall Sheets to mid wall Nogs one per pan Nail each corner Wall Sheet to Studs using two 30mm Clouts evenly spaced Step 3 End Walls Position wall sheet with the LIP...

Страница 9: ...Lay out the two window studs 883mm and Nog 634mm on a flat surface Position Nog and nail in place using 2x 75mm nails at each end Step 6 From the inside of the shed slide Louvre Glass into Louvre Uni...

Страница 10: ...amb Step3 Measure and cut Doorstep Flashing 106 to fit in between Door Jambs Position the Doorstep Flash ing in between the Door Jambs at bottom of door way nail through top of flashing using three 30...

Страница 11: ...ll a hole in right hand end of track 45mm in from outside edge of Corner Flashing Predrill hole in left hand end of track 45mm from outside of door jamb 60mm for Security door option Screw door stops...

Страница 12: ...it may be necessary to temporarily brace the shed with pieces of timber from the packaging Step 3 Position Roof Sheets They should overhang the back top plate by 20mm Ensure timber plates are straight...

Страница 13: ...Position Spouting at the front of the roof ensuring that the ends are flush with the End of the Barge flashings Rivet spout ing onto the Roof at every second Rib Use 2 rivets per end and rivet into Ba...

Страница 14: ...a Floor Board on top of Bottom Plates and Joist and push up against end wall Mark out where Studs are Cut checkouts with Electric Jigsaw so Floor Board will fit around Studs Step 3 Re position Floor...

Страница 15: ...Note See below for security option 15 SECURITY DOOR Optional Step 2 Once door is hung position the Locking Stays so they slide into the Locking Brackets easily Screw Locking Stays to Door Jamb Step 1...

Страница 16: ...lthough it is not essential fitting Damp Proof Course in between the Base Plate and the Floor will give add ed protection against moisture CLEAN UP Remove all swarf drill filings with a soft brush or...

Страница 17: ...e to hear about your Duratuf experience and why you chose us Further to that we would also love to see a picture or a short video of your shed installed and doing its job so that we can share this wit...

Страница 18: ...damage sustained during or after installation NOTE Clean swarf off shed IMMEDIATELY after assembly Do NOT mark cladding with pencil Do NOT allow manures chemicals or other corrosive materials to have...

Отзывы: