background image

11

 

KS1 DOOR

 

Step 3:

 

Remove  the  Door.  Pre

-

drill  and  screw  another  2  screws 

between  the  centre  screw  and  the  rivets  at  each  end        
(5 screws  per  track).  Screw  track  using  45mm  door  track 
screws.

 

Step 2:

 

Hang the door in the Door Track. At the right hand end of 
Door  Track,  adjust  up  or  down  so  that  the  Door  hangs  
parallel with shed. Fit one rivet at right hand end to hold in 
place. Repeat with left hand end of track.

 

Note: Only use rivets at each end of track.

 

Step 1:

 

Position the Door Track (107) on the front wall with the top 
of  the  track  7mm  below  the  top  of  the  timber  frame.  The 
end  of  the  door  track  should  be  20mm  in  from 

 

outside of the right

-

hand corner flashing. 

 

 

Pre

-

drill a hole in the centre of the track and screw in place 

using  one  45mm  door  track  screw. 

Remove  ALL  drill 

filings

 

Note: Ensure Door Track screws are screwed in horizontal  and 

screwed  hard  into  flashing.  Protruding  screw  heads 
can cause door rollers to bind on the screw heads.

 

Step 4:

 

Clean out ALL drill filings. Also make sure the Wheels 
are cleaned of drill filings. Re

-

hang Door. 

 

 

Door Stops: Predrill a hole  in right

-

hand end of track,45mm 

in from outside edge of Corner Flashing. 

 

 

Predrill hole in left

-

hand end of track, 45mm from outside of 

door jamb. 

(60mm for Security door option.)

 

 

Screw door stops in  using 1 x Roofing screw per stop.

 

 

Check door doesn't protrude past outside edge of shed.

 

 

 

KS1 DOOR

 

Step 5:

 

Bottom  Door  Guide:  Slide  the  Door  to  the  corner  of  the  shed. 
Place    the  Door  Guide  (108)  over  the  Guide  Brackets  on  the 
door and align the end of the Door Guide 20mm in from outside 
of the right

-

hand corner flashing. 

 

Step 6:

 

Lift the door guide up approximately 3mm so that the Door will 
Slide freely. Pre

-

drill a hole through the door guide and the end 

rib of the cladding and screw in place using a 45mm screw. 

 

Step7:

 

Slide the door to the centre, ensuring that it slides freely. Pre

-

drill and insert a screw in the other end of the Door Guide. 
Check that the Door is not binding in the middle then pre

-

drill 

and fix with 3 more screws, one in the centre of the guide and 
the other 2 evenly spaced between (5 screws per guide)  into 
the door step flashing and rib.

 

Note:

 

For sheds with Raised Base Plate option the Door Step Flash-
ing will protrude down past the Bottom Plate.

 

Attach Door Guide with rivets.

 

7mm

 

20mm

 

DOOR

 

GUIDE   

 

DOOR       

 

CLADDING

 

BOT-

PLATE

 

GUIDE BRACKET

 

Содержание SHEDS KS1

Страница 1: ...Quality Built In ASSEMBLY INSTRUCTIONS KS1 BASE SIZE 1715mm x 876mm...

Страница 2: ...structions Keith s practical tips and tricks will make your assembly experience that much simpler giving you visual guidance through sections that seem tricky on paper and help you achieve a flawless...

Страница 3: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools wi...

Страница 4: ...0 603m 0 588 x 0 150m 1 Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Window Hardware Pack 1 016m Clear Roof Panel Security Single Door Hardware Pack Alarm MA20 Shed light Bolt Down...

Страница 5: ...KS1 TIMBER FRAME 5 1900 or 1870 for Raised Base Plate only 1 810 YELLOW YELLOW YELLOW YELLOW YELLOW 45 45 0 786 0 876 45 45 45 END WALL 883 45 45 795 1715 90 45 45 FRONT WALL 883 45 785...

Страница 6: ...with other end wall Step 3 Select one 1 715m Base Plate Green and one 1 715m Top Plate 45 x 45 Nail in place Ensure Green joins to Green Step 4 Carefully roll the frame over so that the Ridge Beam and...

Страница 7: ...el Use either crayon or ink to mark steel TERMS EXPLANATION To Tack To Tack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be...

Страница 8: ...he Top Plates and Bottom Plates Nail Wall Sheets to mid wall Nogs one per pan Nail each corner Wall Sheet to Studs using two 30mm Clouts evenly spaced Step 3 End Walls Position wall sheet with the LIP...

Страница 9: ...Lay out the two window studs 883mm and Nog 634mm on a flat surface Position Nog and nail in place using 2x 75mm nails at each end Step 6 From the inside of the shed slide Louvre Glass into Louvre Uni...

Страница 10: ...amb Step3 Measure and cut Doorstep Flashing 106 to fit in between Door Jambs Position the Doorstep Flash ing in between the Door Jambs at bottom of door way nail through top of flashing using three 30...

Страница 11: ...ll a hole in right hand end of track 45mm in from outside edge of Corner Flashing Predrill hole in left hand end of track 45mm from outside of door jamb 60mm for Security door option Screw door stops...

Страница 12: ...it may be necessary to temporarily brace the shed with pieces of timber from the packaging Step 3 Position Roof Sheets They should overhang the back top plate by 20mm Ensure timber plates are straight...

Страница 13: ...Position Spouting at the front of the roof ensuring that the ends are flush with the End of the Barge flashings Rivet spout ing onto the Roof at every second Rib Use 2 rivets per end and rivet into Ba...

Страница 14: ...a Floor Board on top of Bottom Plates and Joist and push up against end wall Mark out where Studs are Cut checkouts with Electric Jigsaw so Floor Board will fit around Studs Step 3 Re position Floor...

Страница 15: ...Note See below for security option 15 SECURITY DOOR Optional Step 2 Once door is hung position the Locking Stays so they slide into the Locking Brackets easily Screw Locking Stays to Door Jamb Step 1...

Страница 16: ...lthough it is not essential fitting Damp Proof Course in between the Base Plate and the Floor will give add ed protection against moisture CLEAN UP Remove all swarf drill filings with a soft brush or...

Страница 17: ...e to hear about your Duratuf experience and why you chose us Further to that we would also love to see a picture or a short video of your shed installed and doing its job so that we can share this wit...

Страница 18: ...damage sustained during or after installation NOTE Clean swarf off shed IMMEDIATELY after assembly Do NOT mark cladding with pencil Do NOT allow manures chemicals or other corrosive materials to have...

Отзывы: