16
34
. Assemble the top back angle left & right (ABLBP
& ABRBP) together with (S7) screws.
See the blow up
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
ABRBP
ABLBP
S7
ABLBP
ABRBP
35
. Place the assembled top angle back in between
the column and back wall panel top side. Then insert
the Ventilation Blocking Cover (VBCF) in between the
top angle and the wall panel. Line up the holes with
panel and secure with (S1) screws from outside.
ABRBP
S1
ABLBP
S1
Fig.1
Fig.2
2
1
ABLBP
ABRBP
VBCF
VBCF
36
. Place the top angle side (ASBP) on top of back
top angle (ABLBP) and top of sliding channel (SLBP).
Secure with (S1) screws from top.
1
2
ASBP
ASBP
S1
S1
Fig.1
Fig.2
ASBP