A. Foundation & Base Frame
Note: It is important that these instructions
are followed step by step.
1
(2) Foundation ‘U’ Channel
(FC1BP)
(2) Foundation ‘U’ Channel
(FC2BP)
(2) Foundation ‘U’ Channel
(FC3BP)
(4) Foundation ‘U’ Channel
(FCCP)
(1) Base bar back left
(BLBP)
(1) Base bar back right
(BRBP)
(2) Base bar side left & right
(BSBP)
(2) Base bar front
(BBFP)
(1) Entrance taper channel
(ECBP)
(8) Sheet metal screws
(S7)
(56) Sheet metal screws
(S1)
Parts needed:
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
1
. Assemble the channel (FC1BP) & (FC2BP)
together using (S1) screws. Make 2 sets.
FC2BP
2
. Make a frame with the sub assemblies as shown below.
Make sure while assembling, the
channel position should be as
shown.
Note
FC1BP
S1
Channel Position
FC3BP
FC2BP
FC1BP
FC1BP
FC2BP
FC3BP
Before Assembling Foundation
make sure that the floor level
should be perfect flat.
Note