![DUNIWAY Stockroom T-752A-F110 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/duniway-stockroom/t-752a-f110/t-752a-f110_instruction-manual_2539776025.webp)
FAX:
(650) 965•0764
TOLL-FREE [US/CA]:
(800) 446•8811
TELEPHONE:
(650) 969•8811
48501 Milmont Drive • Fremont, CA 94538
Page 16
13. Locate DIP Switch S1-1 for CHANNEL 1 (see
Locate DIP Switch S3-8 for CHANNEL 2
14. Set respective DIP switch to proper state
Positive polarity: OFF
Negative polarity: ON
15. Locate and remove the ribbon cable in
to access the JP8 and JP13 pin
headers in
. As shown in
, the ribbon cable is the electrical
component inside the dashed box.
16. Locate the JP8 pin header for CHANNEL 1 (See
)
Locate the JP13 pin header for CHANNEL 2
17. Remove the 2-pin shunt jumper from respective jumper block
18. Re-install 2-pin shunt jumper to the proper position
Positive polarity: Connect
PIN 1
/
PIN 2
Negative polarity: Connect
PIN 2
/
PIN 3
19. Verify all four electrical components are installed to the same polarity setting
20. Re-connect the fan plug and replace top cover
When ready for use, user should re-connect the ion pump cable(s) and power cord. Thereafter,
Terranova® 752A operation may be resumed.
DIP Switch S1-1 and S3-8 control the ± symbol of the HIGH
VOLTAGE display on CHANNEL 1 and CHANNEL 2, respectively.
JP8 activates the proper CHANNEL 1 HV status pin on the
MISC I/O and AUXILIARY I/O port. JP13 activates the proper
CHANNEL 2 HV status pin on the AUXILIARY I/O port.
NOTE
Since 1976