
25
Maintenance & Care
Your new Linkage Renovator will give long and efficient service
if given normal care and maintained properly.
Maintenance Schedule
1 Bolted Connections
All bolted connections of the machine should be checked
after the first 30 hours of operation and retightened if
necessary and thereafter at regular intervals. It is
suggested that this is done annually.
2 Gearbox
The oil level in the gearbox can
be seen in the oil gauge
window (1). Changing the
gearbox oil is normally not
necessary. For refilling the oil
remove the 1/2” BSP plug on
the top face of the gearbox (2),
hydraulic oil Castrol Hyspin
AWH 32-68 should be used.
The total filling capacity is 1.25
litres (refer Fig 19).
DO NOT OVERFILL.
3 Drive Chains
All drive chains (1) (Fig 20)
should first be checked after 20
hours of operation and
thereafter every 200 hours of
operation as follows:-
The metering wheels of the
seed drill are driven via roller
chains from the drive wheel.
Cleaning of the roller chains is
recommended after long
periods of operation. Remove
the chain, wash in kerosene
and then dip them in heated
grease or oil or spray them
with a suitable commercial
roller chain lubricant.
4 Framework
The framework structure should be inspected annually for
defects, i.e., cracks in members or welded connections.
The framework should be cleaned prior to the inspection.
1
1
1
Fig 20
2
Fig 19
Pt. No. 67376
Issue 0207
1
Содержание DO 07185
Страница 2: ......
Страница 24: ...22 Linkage Renovator Calibration Notes ...
Страница 26: ...24 Linkage Renovator Lubrication Notes ...
Страница 29: ...27 Linkage Renovator Maintenance Notes Pt No 67376 Issue 0207 ...
Страница 30: ...28 Linkage Renovator Maintenance Notes ...
Страница 36: ...34 Linkage Renovator Mainframe 1 1 10 12 9 8 17 7 4 18 2 5 13 14 15 16 4 16 15 3 ...
Страница 42: ...40 Linkage Renovator Tine and Boot Assembly 7 8 6 2 4 13 14 5 3 12 14 10 11 9 1 ...
Страница 46: ...44 Linkage Renovator Shafts Chain Tensioners Pedestal 1 3 4 5 5 2 2 2 1 Single Box Dual Box ...
Страница 60: ...58 1 1 2 3 3 4 4 5 6 6 7 7 8 8 9 9 10 10 11 12 13 Linkage Renovator Seeder Mechanism ...