4. Refrigerator Installation and Commissioning
Make sure there is enough cable for the refrigerator to be moved for
maintenance and cleaning.
Ensure that the PV switch on the refrigerator is in the ‘OFF’ position.
Connect the cable to the refrigerator and turn the PV switch ‘ON’.
Very firmly secure the solar cable to the wall, ensuring that if it is pulled
it cannot strain the electrical connections.
Check the refrigerator and freezer compartment temperature displays
for operation. Use a torch if natural light is insufficient.
Check the refrigerator cooling circuit is working (condensers should get
warm).
Check the freezer cooling circuit is working (condensers should get
warm).
Check the freezer fan is working
Allow the temperature to stabilise (this may take up to 7 days)
Check that the refrigerator compartment is +4
C to +6
C, and the
freezer compartment is less than -10
C.
5. Finally…
STOP AND THINK
Have we done a good job?
Is it good quality?
Check that all cables are securely fixed and terminated
Complete the user training. Make sure the user understands:
How to get help,
How to operate the system,
How to do routine maintenance.
Tidy up the site making sure nothing is left behind.
Check that the installation record is complete and signed by the
responsible persons.
Signature of person responsible for installation ......................................................
Signature of person responsible for health centre ...................................................
Содержание VC150SDD
Страница 7: ...VC150SDD Installation Technician s Manual Page 7 of 47 4 Refrigerator Components ...
Страница 16: ...VC150SDD Installation Technician s Manual Page 16 of 47 ...
Страница 17: ...VC150SDD Installation Technician s Manual Page 17 of 47 Attaching solar panels to the rails ...
Страница 34: ...VC150SDD Installation Technician s Manual Page 34 of 47 ...
Страница 46: ...VC150SDD Installation Technician s Manual Page 46 of 47 30 VC150SDD System Layout ...