VC150SDD Installation & Technician’s Manual
Page 27 of 47
18. System Commissioning
Complete the Installation & Commissioning record at the end of this manual (Section 26)
and ensure all manuals are stored close to the refrigerator for ease of reference.
Connect the solar panels and allow the refrigerator to run for at least 7 days.
Periodically check the solar array between sunrise and sunset during the first few days of
operation to ensure that there is no chance of any shading. If it looks like shading may
become a problem later on (i.e. when the sun is lower in the sky) move the solar array to a
better location adjusting the solar and earth cable accordingly.
When the refrigerator compartment temperature display reads +4.5°C or less by 4pm in the
afternoon, then the cold store is sufficiently charged (this may take a few days depending
on the level of sunshine).
Follow our instructions for loading vaccines in Section 19 below.
Only store vaccines in
the refrigerator.
Leaving space for air circulation around the contents of the refrigerator will help to stabilise
temperatures quicker and maintain an even temperature throughout the compartment.
Keep the lid closed at all times, open only when required and lock after use.
Ensure the users understand the basic functions of the refrigerator and that they are also
aware of the correct operational procedures and maintenance tasks for this refrigerator.
Содержание VC150SDD
Страница 7: ...VC150SDD Installation Technician s Manual Page 7 of 47 4 Refrigerator Components ...
Страница 16: ...VC150SDD Installation Technician s Manual Page 16 of 47 ...
Страница 17: ...VC150SDD Installation Technician s Manual Page 17 of 47 Attaching solar panels to the rails ...
Страница 34: ...VC150SDD Installation Technician s Manual Page 34 of 47 ...
Страница 46: ...VC150SDD Installation Technician s Manual Page 46 of 47 30 VC150SDD System Layout ...