background image

2

Installation and Operation of: 

FlexBake 5™ Integrated Ventilation System

IMPORTANT SAFETY INSTRUCTIONS

Throughout this manual, you will find the following safety words and symbols that signify 

important safety risks with regards to operating or maintaining the equipment.

 

Indicates a hazardous situation which, if not avoided, could 

result in death or serious injury.

CAUTION

 

Indicates a hazardous situation which, if not avoided, could    

 

result in minor or moderate injury. 

     

CAUTION

 

Indicates Important Information

 

                  

Indicates electrical shock hazard which, if not avoided, could 

result in death or serious injury and/or equipment damage.

                   

Indicates hot surface which, if not avoided, could result in 

minor or moderate injury. 

 Indicates hot surface which, if not avoided, could result in 

minor or moderate injury.  Specifically, risk of burn from 

heating elements.

                                  

Indicates rotating fan blade hazard which, if not avoided, 

could result in minor or moderate injury.

TABLE OF CONTENTS 

Important Safety Instructions ............................................................................................................................ 2
Specifications ........................................................................................................................................................... 4
Wire Schematic........................................................................................................................................................ 5
Unpacking Instructions ........................................................................................................................................ 6
Removal of Old Facade ......................................................................................................................................... 6
Installation of  New IVS Hood ............................................................................................................................ 8
Configure IVS Hood to FlexBake

TM 

 .................................................................................................................11

Oven Start Up ........................................................................................................................................................12
Care and Cleaning ................................................................................................................................................12
Troubleshooting ...................................................................................................................................................12

Содержание FlexBake 5 IVS-208-FB5

Страница 1: ...al is Copyright 2019 Duke Manufacturing Co All rights reserved Reproduction without written permission is prohibited Duke is a registered trademark of the Duke Manufacturing Co CAUTION Please read thi...

Страница 2: ...rmation Indicates electrical shock hazard which if not avoided could result in death or serious injury and or equipment damage Indicates hot surface which if not avoided could result in minor or moder...

Страница 3: ...unter A minimum clearance of 6 152 4 mm from the top of the unit to the ceiling must be provided The following warnings and cautions appear throughout this manual and should be carefully observed Turn...

Страница 4: ...5 37 2 94 6 34 6 87 9 164 61 2 Inches 40 5X37 1X14 2 CM 102 9X94 2X36 1 Inches 45 5X42 3X21 5 CM 115 6X107 4X54 6 IVS CE FB5 78 5 199 5 37 2 94 6 34 6 87 9 164 61 2 Inches 40 5X37 1X14 2 CM 102 9X94 2...

Страница 5: ...Cool Down Drip Valve ORN BLK WHT BLK YEL Top Vent Blower BLK PUR Bottom Vent Damper BLK PUR BLK 208V RED 230V WHT COM WIRING SCHEMATIC Oven Conv Blower WHT BLK 9 8 7 6 5 4 3 2 1 YEL BLU BLK ORN WHT P...

Страница 6: ...Remove the 4 wood screws 2 per side flange securing the IVS assembly to the wooden slats and pallet Carefully remove any blocking and lift the IVS out of the carton and inspect for any shipping damage...

Страница 7: ...the Vent Box Remove the Facade Vent Box SAVE NUTS Step 6 Remove the Facade Back Panel by removing the 7 Tek screws and the 4 8 32 screws SAVE SCREWS Step 7 Remove the 6 Tek screws along each side pane...

Страница 8: ...ep 2 Install the IVS Vent Box supplied and Venturi removed in previous Step 4 with 4 8 32 screws NOTE With the Back Panel loosely attached ensure all holes are aligned to prevent cross threading or bi...

Страница 9: ...ecure the IVS duct to the oven exhaust duct Step 8 Install the 6 screws 3 per side Tek screws previously removed in Step 7 Step 9 Connect the IVS assembly blower motor to the oven harness IVS Blower M...

Страница 10: ...perly in place Step 14 Align the IVS Cover holes and install the 14 screws 8 32 to secure it Step 15 Connect the IVS blower outlet as required per local codes and or other applicable codes using 5 rig...

Страница 11: ...t the local electrical codes and shall be of sufficient length to allow the equipment to be moved for cleaning IMPORTANT A minimum clearance of 6 from the top of unit to the ceiling must be provided C...

Страница 12: ...ched vent piping CARE AND CLEANING ELECTRICAL SHOCK HAZARD DO NOT WASH WITH WATER JET OR HOSE DO NOT USE OVEN CLEANERS CAUSTIC CLEANERS DEGREASERS ACIDS AMMONIA PRODUCTS ABRASIVE CLEANERS STEEL WOOL O...

Отзывы: