manualshive.com logo in svg
background image

Page 15

An unlocking system is provided to unlock the trolley and move the door manually. Composed by an iron
wrap with his sheath, it must be connected to the unlocking undle positioned on the trolley.
Pass the iron wrap  inside the hole of the handle and slide it into the sheath (Draw.34) then pass the iron
wrap and sheath into the  door fixing plate (Draw.36)
Fix the iron wrap on the handle of your door using the supplied  wrap-compressor (Draw.37-38).

To unlock the gate

from inside or utside rotate the door handle anti-clockwise (Draw.38). 

To lock the trolley,

moove manually the door until the belt securing plate  fits again in the trolley ( it will

happen automatically while mooving the door.

WARNING: to control the door with your radio remote control, the  trolley must be locked!

7. Manual release system

Once the opener has been
installed, tighten the belt by
means of the belt tightener as is
showed in draw.33 so that the
belt does not swing excessively
during movement. Do not over
tighten the belt.

8° step:

belt tightener 

Draw.33

turn the nut to tight the belt

WARNING: 
for installation on a 
projecting up-and-over door,

an extra canopy arm (not supplied inside the kit)  is
needed  to  connect the trolley to the door) as in draw.
32/B.

Please see also page 6 point 3.3.
.
Please refear to the specific intruction manuals sup-
plied with the canopy arm to be separately purchased.

door
fixing
plate

iron wrap 

sheath 

Draw.36

Draw.35

iron
wrap 

sheath 

Draw.34

trolley

CANOPY ARM

# 992012

standard door braket

Draw.32/ B

Содержание 8500 SF

Страница 1: ...Sectional door max h 2 15 m max h 2 30 m Min 5 cm Power 230 V 50 Hz 8 24 V dc Gear 11 18 sec Opening time WARNING Carefully read this mounting instruction before installation In case you should requi...

Страница 2: ...s Installation Scheme 7 9 5 Assembly instructions 10 12 6 Fixing instructions 13 14 7 Manual release 15 8 230V power supply 16 9 Remote control coding 17 10 Power adjustment 17 11 Electronic board CTH...

Страница 3: ...all ropes connected to garage door before installing and operating garage door opener to avid entanglement To prevent damage to garage door and opener Always disable locks before installing and opera...

Страница 4: ...t of garage door travel limits will interfere with pro per operation of safety reversal system Too much force on garage door will interfere with proper operation of safety reversal system Never increa...

Страница 5: ...board CTR29S receiver and transformer One rolling code 2 channels radio transmittent 433 92 Mhz Belt drive 270 cm U iron rail 3 x 90cm with 2 connectors Manual unlocking device from inside outside Mo...

Страница 6: ...separately Draw 2 Draw 3 Draw 4 Use the 2 standard door bra kets to connect the trolley to the door trolley standard door brakets standard door braket sectional door shaft 992014 Use 1 standard door...

Страница 7: ...e pur chased separately as optional safety device ceiling rail To fix the rail of the garage door opener a minimal distance of 5 cm is needed between ceiling and door And a minimal distance of 1cm is...

Страница 8: ...Page 8 Installation scheme Wall mount this zone must be strong and reinforced with an iron plate if needed Draw 7...

Страница 9: ...p plied parts 821 CAUTION to prevent injury from pinching keep hands and fingers away from the joints while assembling the rail to avoid serious injury to fingers from moving garage door opener always...

Страница 10: ...ley and around the pulley Assemble the 3 elements of the rail part 829 by fitting them into the 2 rail braces part 830 See draw 8 10 The pulley and the trolley are supplyed pre assembled Draw 11 Draw...

Страница 11: ...ate as showed on draw 13 14 WARNING The securing plate must connect the belt in a specific position on the side opposite to the unlocking plug fixed on the trolley and between the trolley and the pull...

Страница 12: ...rews draw 18 Insert the U rail into the plate through the guides until it stops draw 19 20 NOW your garage door opener is full mounted and ready to be fixed to the door Draw 19 Draw 18 Draw 20 Draw 21...

Страница 13: ...sory 992012 up and over doors 6 step Motor Head Mount Draw 24 Position the pilot holes horizontally on the vertical centre line of the door Fasten the bracket 828 to the door jamb or wall by means of...

Страница 14: ...to the door by means of 2 bolts not supplied of the right size and type accor dingly to your door draw 30 Warning the fastening area must be reinforced and structurally resistant 7 step Door fixing Dr...

Страница 15: ...en automatically while mooving the door WARNING to control the door with your radio remote control the trolley must be locked 7 Manual release system Once the opener has been installed tighten the bel...

Страница 16: ...raw 39 40 Connect the 230 V 50 60 Hz input cable to the transformer terminal board draw 41 42 43 A fuse is mounted on the transformer to protect low voltage system draw 42 We recommand to use a cable...

Страница 17: ...red by each electronic board of the gate opener To erase the codes from the control board To deactivate any unwanted remote first erase its memory from the electronic board of your garage opener as fo...

Страница 18: ...ax pause time of 100 sec 1 ANTENNA CABLE 2 GROUND Antenna 3 5 START 4 5 Photo beam contact 6 PHOTO BEAM POSITIVE 7 PHOTO BEAM NEGATIVE 7 8 blinking light 24V 10W max 9 10 extra courtesy light 13 14 li...

Страница 19: ...nd green will stop the door movement when they get in correspondance of thelli mit switch Red Flag closed door Green Flag open door 1 your door closed Position the red flag in correspondance of the li...

Страница 20: ...eries is approx 2 years Batteries can be replaced with the following model 12V type A23 5mA Protection fuse In the event of short circuit the protection fuse can be replaced with the following type Fu...

Страница 21: ...of worn out parts b Transport handling or installation costs relating to this product c Improper use mistakes in the operation and incorrect installation d Damages caused by fire water natural phenome...

Страница 22: ...d safety norms indicated by the Manufacturer are in conformity to the applicables sections of standards EMC EN61000 6 2 EN61000 6 3 EN301489 3 EMF EN50366 EN50371 SAFETY EN60335 1 4 ed EN60335 1 2002...

Отзывы: