4-10
Maintenance
13. Make sure to place the new roll in the positioning guide according to type/width:
Nonvowen
PET
37" width rolls = Position 'a'
44" width rolls = Position 'b'
PET = Positition 'b'
14. Remove any protection wrap from the new roll
and check the material for any signs of
damage.
CAUTION:
Remove any damaged
material. This will avoid web breaks
during loading of the material.
15. Place the new roll in the positioning guide on
the Translyftlift table.
CAUTION:
For correct mounting and
threading of the material in the
processor, it is important that the coil
direction of the roll is from "up-to-down"
as illustrated.
16. Lift up the support on the front of the lift table,
to prevent the roll from falling off during
transport.
17. Push the air shaft into the cylinder of the new
roll.
CAUTION:
Make sure to insert the air
shaft in the cylinder-end that will face
the air-connection side of the processor
when mounted!
Operation Manual
|
Cyrel FAST 2000TD
January, 2020
Содержание Cyrel FAST 2000TD
Страница 37: ...Operation procedures 2 19 Blank January 2020 Operation Manual Cyrel FAST 2000TD...
Страница 38: ...3 0 Panel overview Panel overview Operation Manual Cyrel FAST 2000TD January 2020...
Страница 49: ...Control panel 3 11 Menu diagram January 2020 Operation Manual Cyrel FAST 2000TD...
Страница 86: ...Operation Manual Cyrel FAST 2000TD January 2020...
Страница 106: ...B 14 Appendix B Blank Operation Manual Cyrel FAST 2000TD January 2020...