![DSC LINKS1000 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/dsc/links1000/links1000_installation-manual_2534878025.webp)
25
Sur-Gard P1664
The Sur-Gard P1664 control panel must be equipped with software version 2.0 or later.
Mode 22, Address [008]: System Options
Turn ON option 59 (toggle bit 3) to enable operation with the LINKS1000.
Mode 22, Address [037]: Programmable Output 3 Definition
Program PGM3 as type 37 for LINKS1000/2000 control
Mode 20, Address [101]-[116]: Zone Definitions
Program the zone(s) being used for LINKS1000 Supervisory as Type “70”, 24-hour silent. If the Force Answer
for Downloading feature is being used, program the zone for the Force Answer as type “E0”.
Mode 20, Address [025]-[030]: LINKS1000 Preamble Codes
If needed, program thses locations with the LINKS1000 preamble code. (Check with your cellular provider
for correct dialing sequence.) Program all unused digits as trailing hexadecimal “F”.
Mode 20, Address [744]: LINKS1000 Event Description and Test Transmission Code
Program a three digit reporting code to enable the LINKS1000 Test Transmission Code. If the LINKS1000 Test
Transmission is not being used, program this location as “00”.
Power-up Procedure
Apply power to the transformer and wait approximately 10 seconds. If LED1 begins to flicker once every 4
to 5 seconds, check the following:
• Ensure that the PGMIn and GND terminals are properly wired
• Ensure that the Control Panel is programmed for LINKS operation
NOTE : The LINKS1000 will not operate if the AC is off and the battery is low. The LINKS1000
should not be powered up without the antenna attached to the unit.
TESTING THE SYSTEM
Before testing the LINKS1000 unit, ensure that the control panel is correctly programmed and operating
properly by performing a test transmission to the monitoring station over the normal telephone line. If problems
are encountered in communicating over the normal telephone line, ensure that the communication options,
telephone numbers and account numbers are programmed properly in the control panel. The control panel
must be programmed properly in order for the LINKS1000 to operate.
To test the LINKS unit, apply power to the unit after all wiring connections have been made. Ten seconds after
power is applied to the LINKS unit, LED1 on the unit will begin to flash. Observe LED1 for at least 40 seconds;
if LED1 flashes once every ten seconds, then the LINKS unit is operating properly. If there is a trouble condition,
LED1 will flash several times every ten seconds. Refer to the “Trouble Supervision” section of this manual.
Performing a LINKS Test Transmission
Contact the monitoring station to request a transmission test. Remove the telephone cord from the RJ31-X
jack. Perform a Bell Test as described in the control panel’s Installation Manual. When the test is complete,
contact the monitoring station to confirm the transmission. Perform additional test transmissions as required by
the monitoring station.
NOTE: Whenever a cellular telephone call is answered by a receiver or another phone, cellular charges will
be applied to the cellular telephone account that placed the call. Therefore keep in mind that test signals
will increment the cellular bill. If for some reason the call is established; however, the alarm signal is not
received, the cellular account will still be billed. Please double check the installation before you test.