DOC-0171 Rev G-9
1 6
© 2017 DROPLET MEASUREMENT TECHNOLOGIES
3. If you want to connect the SP2 directly to the pump without a Drierite cartridge, connect the SP2
purge valve to the SP2 Pump purge port. See Figure 8.
Figure 8: Connecting the SP2 Purge Valve to the SP2 Pump Purge Port
4. Plug in the SP2 pump power connector to the back of the SP2 instrument.
5. Plug in the SP2 power supply. See warning below.
Warning:
If not properly grounded, the instrument can cause an electrical shock.
Use a three-conductor cord and a plug appropriate for the location in which the
instrument will be used. Connect the plug to a properly grounded receptacle.
3.3 Turning On the System
To turn on the SP2, follow the instructions below.
Note:
Users who have the SP2 with an Auto
Sampler and Nebulizer should consult
DOC-0318,
the
Set-up and Operation Manual for the SP2 with
Auto Sampler
for this procedure.
1.)
Turn on the SP2 Computer using the
Computer
switch on the SP2.
2.)
Turn on the SP2 using the
System Power
switch on the SP2.
2
The SYSTEM POWER switch controls the power to the SP2 analyzer electronics, and is the
master switch for the SAMPLE PUMP power. If SYSTEM POWER is off, the PUMP cannot be
powered. The COMPUTER switch is independent of the other two switches, and turns only the
computer on and off.