DOC-0171 Rev G-9
1 5
© 2017 DROPLET MEASUREMENT TECHNOLOGIES
2.)
If you want to connect a Drierite cartridge to the system, follow the steps below. (Both the
Drierite and Nafion dryer are used to dry sheath and purge flow air in humid conditions.)
a.
Connect the Poly tubes exiting the SP2 purge port to the Drierite cartridge (Figure 6).
Figure 6: Connecting SP2 Purge Valve to Drierite Cartridge
b.
Connect the Drierite cartridge to the out-flow purge port on the SP2 pump (Figure 7). The out-
flow purge port is on the left side of the pump.
Figure 7: Connecting SP2 Pump Purge Port to Drierite Cartridge
c.
Plug in the power supplies for the SP2 and SP2 pump. The set-up is now complete; you do
not need to follow the steps below.