Rocket Installation and Operation Manual
27
7 Clearances to Combustible Material
The clearances shown in this section have been determined by test according to
procedures set out in safety standards ULC S627 (Canada), UL1482 (U.S.A.) and UL737
(U.S.A.). When the stove is installed so that its surfaces are at or beyond the minimum
clearances specified, combustible surfaces will not overheat under normal and even
abnormal operating conditions.
No part of the stove or flue pipe may be located closer to combustibles than the
minimum clearance figures given.
7.1 Location of the certification label
Since the information given on the certification label affixed to the appliance always
overrides the information published, in any other media (owner’s manual, catalogues,
flyers, magazines and/or web sites) it is important to refer to it in order to have a safe and
compliant installation. In addition, you will find information about your stove (model, serial
number, etc.). You can find the certification label on the back of the stove.
7.2 Clearances to Walls and Ceiling
The clearances to combustible walls may be slightly different in Canada and the U.S.A.
and may also differ depending on whether you use single or double wall flue pipe. Please
be sure to choose the correct clearance for your location and type of flue pipe. See figure
Clearances to combustible materials and floor protection to match each letter to a
clearance.
APPLIANCE CLEARANCES
(INSTALLATION WITH SINGLE
WALL PIPE CONNECTOR)
CANADA
USA
A
15½" (394 mm)
15" (381 mm)
B
18" (457 mm)
18" (457 mm)
C
10" (254 mm)
10" (254 mm)
K
48" (1220 mm)
48" (1220 mm)
L
84" (213 cm)
84" (213 cm)
APPLIANCE CLEARANCES
(INSTALLATION WITH DOUBLE
WALL PIPE CONNECTOR)
CANADA
USA
A
10" (254 mm)
10" (254 mm)
B
18" (457 mm)
18" (457 mm)
C
10" (254 mm)
10" (254 mm)
K
48" (1220 mm)
48" (1220 mm)
L
84" (213 cm)
84" (213 cm)
Note: These clearances are also valid for an alcove installation.
Содержание Rocket DB03185
Страница 9: ...Rocket Installation and Operation Manual Rocket Installation and Operation Manual 9...
Страница 29: ...Rocket Installation and Operation Manual 29 Clearances to combustible materials and floor protection...
Страница 32: ...Rocket Installation and Operation Manual 32 Clearances for shield construction...
Страница 44: ...Rocket Installation and Operation Manual 44 Appendix 4 Exploded Diagram and Parts List...