HeatMax II Furnace Installation and Operation Manual
62
10.1 Installation of secondary air tubes and baffle
1- Starting with the rear tube, lean and
insert the right end of the secondary air
tube into the rear right channel hole.
Then lift and insert the left end of the
tube into the rear left channel.
2- Align the notch in the left end of the tube
with the key of the left air channel hole.
Using a “Wise grip” hold the tube and
lock it in place by turning the tube as
shown in Detail B. Make sure the notch
reaches the end of the key way.
3- Repeat step 1 and 2 for the other
secondary air tubes.
4- To remove the tubes use the above
steps in reverse order.
Содержание HEATMAX II DF01001
Страница 30: ...HeatMax II Furnace Installation and Operation Manual 30 ...
Страница 64: ...HeatMax II Furnace Installation and Operation Manual 64 11 Exploded diagram and parts list ...
Страница 65: ...HeatMax II Furnace Installation and Operation Manual 65 ...
Страница 66: ...HeatMax II Furnace Installation and Operation Manual 66 ...
Страница 67: ...HeatMax II Furnace Installation and Operation Manual 67 ...
Страница 68: ...HeatMax II Furnace Installation and Operation Manual 68 ...
Страница 74: ...HeatMax II Furnace Installation and Operation Manual 74 12 2 1 Technical data HeatMax II ...
Страница 75: ...HeatMax II Furnace Installation and Operation Manual 75 ...