HeatMax II Furnace Installation and Operation Manual
31
7.2 Installation and connection of the “RTD” thermal probe
IMPORTANT: The proper positioning of the “RTD” thermal probe is essential to the proper
functioning of the furnace. Install it in the opening provided for this purpose on the start-off
plenum.
With the plenum extension (A) and the plenum (B)
With 6 self-taping screws
(D), install the metal
plate on the plenum (B)
to block-off the 3 holes.
Make sure the notch
towards the bottom.
Install the RTP probe in
the plenum extension
(A).
Secure the RTD probe
with the two screws
provided (C).
Connect the RTD probe
on the furnace with the
connection.
Содержание HEATMAX II DF01001
Страница 30: ...HeatMax II Furnace Installation and Operation Manual 30 ...
Страница 64: ...HeatMax II Furnace Installation and Operation Manual 64 11 Exploded diagram and parts list ...
Страница 65: ...HeatMax II Furnace Installation and Operation Manual 65 ...
Страница 66: ...HeatMax II Furnace Installation and Operation Manual 66 ...
Страница 67: ...HeatMax II Furnace Installation and Operation Manual 67 ...
Страница 68: ...HeatMax II Furnace Installation and Operation Manual 68 ...
Страница 74: ...HeatMax II Furnace Installation and Operation Manual 74 12 2 1 Technical data HeatMax II ...
Страница 75: ...HeatMax II Furnace Installation and Operation Manual 75 ...