HeatMax II Furnace Installation and Operation Manual
24
5.3 Installation of the assembled plenum on the furnace
Identify the right side of the plenum, it is
provided with holes for the installation of the
“RTD” thermal probe.
Also, 5 holes are aligned with the fold of the
top of the furnace on the right side and
three holes on the other sides. This allows
you to secure the plenum properly.
Install the assembly on the furnace, taking
care to insert the 4 fold on top of the
furnace inside the plenum.
Using 14 screws, secure the plenum to the
furnace.
Содержание HEATMAX II DF01001
Страница 30: ...HeatMax II Furnace Installation and Operation Manual 30 ...
Страница 64: ...HeatMax II Furnace Installation and Operation Manual 64 11 Exploded diagram and parts list ...
Страница 65: ...HeatMax II Furnace Installation and Operation Manual 65 ...
Страница 66: ...HeatMax II Furnace Installation and Operation Manual 66 ...
Страница 67: ...HeatMax II Furnace Installation and Operation Manual 67 ...
Страница 68: ...HeatMax II Furnace Installation and Operation Manual 68 ...
Страница 74: ...HeatMax II Furnace Installation and Operation Manual 74 12 2 1 Technical data HeatMax II ...
Страница 75: ...HeatMax II Furnace Installation and Operation Manual 75 ...