6
CLEARANCES FROM COMBUSTIBLES
It is of outmost importance that the clearances to combustible materials be scrupulously
respected upon installation of the stove you have selected. Refer to the tables below :
Single pipe / Double pipe
A B C D E F
29” 30” 39”
34-3/4”
22” 32”
•
Floor to ceiling height must be at least 7' (84") in all cases.
•
The clearance between the flue pipe and a wall are valid only for vertical walls and for
vertical flue pipe.
•
The flue pipe must not go through roof trussing, an attic, a wardrobe, a floor, a
combustible partition, or similar spaces.
•
A flue pipe crossing a combustible wall must have a minimum clearance of 18".
•
To reduce flue pipe clearances from combustible materials, contact your local safety
department.
•
For reduced clearances refer to NFPA 211 table 9-6.6.1.
Содержание EE1200 Cmpak
Страница 11: ...10 MASONRY CHIMNEY Clay liner Thimble Clean out door...
Страница 12: ...11 FACTORY BUILT THIMBLE...
Страница 13: ...12 BRICK THIMBLE...