39
CRUV INSTALLATION, OPERATION, AND MAINTENANCE MANUAL
MAINTENANCE
RO/DI water option
5. Check the operation of the float valve and the condition of the float seat.
6. Check the low water switch to make sure the float slides freely on the stem.
7. Secure the chamber cover making sure the cover gasket is seated and the
chamber is sealed.
8. Reinstall the evaporating chamber.
• Reconnect the fi ll line.
• Reconnect electrical plugs (the plugs are color coded).
• Reconnect drain union.
• Reconnect steam hose.
9. Verify electrical connections:
• Verify that all DIN rail-mounted components are securely fastened to DIN
rail.
• Verify that all power terminal screws and lugs are tight from power block
to heaters.
• Verify that all plugs are completely plugged in.
10. Close the drain valve.
11. Turn on the water supply.
12. Turn on the electrical power.
OFF-SEASON SHUT-DOWN PROCEDURE
1. Switch off electric power.
2. Remove the enclosure.
3. Shut off the water supply to the makeup valve.
4. Drain the evaporating chamber by opening the drain valve. For units with
an end-of-season drain, refer to the
Vapor-logic Installation and Operation
Manual
.
5. Replace the enclosure.
6. Leave the evaporating chamber dry, the power off, and the water shut-off
valve closed until the next humidification season.
mc_061610_1520