DRIESCHER
WEGBERG
MINEX
®
-E
5
6) Place the switching cubicles that way side by side, that the coupling isolation parts and the internal
cone bushings towards each other. Coincident the screws in the base box have to be towards the
holes.
7) Lead the switching cubicles parallel together. Take care not to tilt the cubicles.
8) First secure the two switching cubicles in the
base box by easy screwing the bolts.
9) Place each in the front and rear the square assembly aids on to the sides above the switching
cubicles. Set the parallel clamps on to the square assembly aids.
DRIESCHER
WEGBERG
DRIESCHER
WEGBERG
DRIESCHER
WEGBERG
DRIESCHER
WEGBERG
DRIESCHER
WEGBERG