DRIESCHER
WEGBERG
MINEX
®
-E
4
Assembly sequence:
1) Lead fixing screws M12x55 (6) according to
the instructions on the drawing HB71553-
001 through the holes provided in the base
box.
2) Lead the fixing screws M12x70 (7) through
the holes provided in the front area of the
base box.
3) Screw the spacing bushes (5) tight as
shown.
4) Replace two non-sealed inner hexagon
screws per phase by the cylinder head
screws (4), if these are not factory available.
Coat the coupling isolation part (1) with the
supplied fitting lubrication (2). Place the
coupling isolation parts into the internal cone
bushings of a cubicle.
Do not loosen sealed screws
.
5) Tension the spring (3) for earthing of the
cubicle control into the slot of the coupling
isolation part between the earthing studs
(cylinder head screw (4)).
spring (3)
DRIESCHER
WEGBERG
DRIESCHER
WEGBERG
DRIESCHER
WEGBERG
DRIESCHER
WEGBERG