background image

DRIESCHER 

 WEGBERG

 

 

 

MINEX

®

-E

 4 

 

 

Assembly sequence:

 

 
 
 
 
 
 
1)  Lead fixing screws M12x55 (6) according to 

the instructions on the drawing HB71553-
001 through the holes provided in the base 
box.  

2)  Lead the fixing screws M12x70 (7) through 

the holes provided in the front area of the 
base box. 

3) Screw the spacing bushes (5) tight as 

shown. 

 

 
 

 
 
 
 
 
4) Replace two non-sealed inner hexagon 

screws per phase by the cylinder head 
screws (4), if these are not factory available. 
Coat the coupling isolation part (1) with the 
supplied fitting lubrication (2). Place the 
coupling isolation parts into the internal cone 
bushings of a cubicle. 

 
 

 

Do not loosen sealed screws

 

 

 
 
 
 

 

 
 
 
 
 
 
5)  Tension the spring (3) for earthing of the 

cubicle control into the slot of the coupling 
isolation part between the earthing studs 
(cylinder head screw (4)).  

 

 

 
 

 

spring (3) 

 DRIESCHER 

 WEGBERG 

     

 DRIESCHER 

 WEGBERG 

 DRIESCHER 

 WEGBERG 

 DRIESCHER 

 WEGBERG 

Отзывы: