
SECTION 5
MAINTENANCE
Page 52
OM560C99/1E
DRESSTA
LOADER EQUIPMENT
To replace the bucket carry out as follows:
1. Park the machine on level ground or in the workshop.
2. Place the bucket in position as shown in Fig. 5.59.
3. Remove bolts 1 and tap pins 2 out.
4. Move away with the machine or lift the boom.
5. Protect disassembled O-rings 3 and 1.5 mm shims 4.
6. Reinstall the bucket in the reverse order.
IMPORTANT:
Allowable gap between bucket supports and boom arms is 1.5 mm. If gaps are
bigger, fill symmetrically with shims.
WARNING! When replacing the bucket take care. Disassembled heavy compo-
nents of loader linkage system (boom arms, connector) must be securely
protected against sudden movement.
Содержание 560C
Страница 1: ...OM560C99 1E OPERATOR S MANUAL 560C SERIAL NUMBERS 15001 AND UP ...
Страница 3: ......
Страница 5: ......
Страница 7: ......
Страница 10: ...SECTION 1 INTRODUCTION ...
Страница 11: ...INTRODUCTION SECTION 1 DRESSTA OM560C99 1E SECTION CONTENTS 1 1 Introduction 3 1 2 Serial Numbers 4 ...
Страница 12: ......
Страница 16: ...SECTION 2 SAFETY PRECAUTIONS ...
Страница 18: ......
Страница 32: ...SECTION 3 MACHINE TRANSPORT AND STORAGE ...
Страница 34: ......
Страница 42: ...SECTION 4 OPERATING ...
Страница 43: ......
Страница 45: ......
Страница 49: ...SECTION 4 OPERATING Page 6 OM560C99 1E DRESSTA UNIVERSAL SYMBOLS FOR INSTRUMENTS AND CONTROLS ...
Страница 88: ...SECTION 5 MAINTENANCE ...
Страница 141: ...SECTION 6 SPECIFICATIONS ...
Страница 143: ......
Страница 151: ...SECTION 6 SPECIFICATIONS Page 10 OM560C99 1E DRESSTA 6 7 WIRING DIAGRAM Fig 6 5 Wiring Diagram ...
Страница 154: ...SPECIFICATIONS SECTION 6 Page 13 DRESSTA OM560C99 1E WIRING DIAGRAM Fig 6 6 Wiring Diagram Of Cab ...