Installation
2-3
April 2003
Part No. 917404-001 Rev. B
2
INSTALLATION
2.
2.1 Introduction
The following information describes how to install the HyperPIB board and the RS-232 cable
interface in the site controller.
2.2 Unpacking And Inspection
1.
Before opening any cartons, count the number of cartons and verify the carton count against the
supplied packing list.
2.
Inspect the cartons for damage made during transit.
3.
File claim information with the carrier on the bill of lading.
4.
Retain cartons suspected of damage for future claim purposes.
CAUTION:
To remove electronic components from static packages, you must wear an anti-static
wrist strap, part number 916962. The wrist strap must be securely attached to an earth grounding
point to prevent possible damage from static electricity.
5.
Remove all equipment from the shipping cartons and carefully inspect for damage.
NOTE:
Any damage should be brought to the attention of the carrier and claims made immediately.
Return all equipment to the respective cartons for protection until actual installation is made. Save all
cartons until it is certain that return shipments are not required.
Содержание Wayne HyperPIB Series
Страница 1: ...INSTALLATION Wayne Hyper Peripheral Interface Board HyperPIB ...
Страница 2: ......
Страница 3: ...Wayne HyperPIB Peripheral Interface Board Installation Manual ...
Страница 17: ......