Installation
2-7
April 2003
Part No. 917404-001 Rev. B
2.4.2.2 Connectors
Table 2-1
HyperPIB Connectors
Connector
Destination
J1
Primary AC
J2
Secondary AC
J6
Debug Monitor
2.4.2.3 LEDs
Table 2-2
HyperPIB LEDs
LED
Function
CR11
Receiving data from Secondary AC
CR12
Receiving data from Primary AC
CR13
Pump link B active
CR14
Pump link A active
CR15
Console active
2.4.2.4 Pin Definitions
Table 2-3
RS-232 (DB-25) Pin Definitions
PIN Number
Signal Direction
Definition
1
<——>
FG - Frame Ground
2
——>
TX - Transmit
3
<——
RX - Receive
4
——>
RTS - Request To Send
5
<——
CTS - Clear To Send
7
<——>
SG - Signal Ground
8
<——
CD - Carrier Detect
20
——>
DTR - Data Terminal Ready
2.4.3 HyperPIB Board And RS-232 Cable Installation
To install the HyperPIB board perform the following steps.
Содержание Wayne HyperPIB Series
Страница 1: ...INSTALLATION Wayne Hyper Peripheral Interface Board HyperPIB ...
Страница 2: ......
Страница 3: ...Wayne HyperPIB Peripheral Interface Board Installation Manual ...
Страница 17: ......