Rev.1.1
Page 2
Preparation
1. After opening the boxes, read this introduction carefully, check all the packed parts are
complete by cross checking all the components against the “Detailed Diagram of Shower
D
oor Components”. Examine for shipping damage. If the unit has been damaged or has a
finishing defect, please contact your local distributor within 3 business days. Please note that
Bath Authority
TM
/ DreamLine
TM
will not replace any damaged product or parts free of
charge after 3 business days or if the product has been installed.
Contact your
distributor or DreamLine if you have any questions.
2.
Please note that you should consult your local building codes on questions on
installation compliance standards. Building and plumbing codes vary by location, and
DreamLine is not responsible for code compliance standards for your project.
3. Install all of the required plumbing and drainage before securing the shower.
Use a
competent and licensed (if required by local code) plumber for all plumbing
installation.
4. Please insure that prior to the installation the floor is leveled and solid and will be able to
support the total weight of the unit and its occupant. Also make sure the walls are at right
angles. While some adjustment in leveling of the tray is possible, irregular floor level or
improper angle of side walls will result in serious problems for your installation. Please, note
that there are some adjustments and drilling might be necessary during the installation
process.
5. For the shower tray
installation, please refer to our
Shower Tray Installation Manual
.
Once the tray is installed and the interior wall is finished, then you can start the
installation of your shower enclosure.
Tools Required
Содержание TETRA
Страница 6: ...Rev 1 1 Page 6 Fig 3 Fig 4 Fig 5 Fig 6 ...
Страница 7: ...Rev 1 1 Page 7 Fig 7 Fig 8 Fig 9 Fig 10 ...
Страница 8: ...Rev 1 1 Page 8 Fig 11 Fig 12 Fig 13 Fig 14 ...