background image

27

At the same time the software developed for the professional spectrum analysis capabilities,
even the most professional personnel must be based on the function of a good analysis. The
function - Analysis of Measurement - Spectrum ray trace - Professionals can make the sample
case - tracing the edit icon in the View

view of spectrum. The line spectrum is easily to identify

whether the interference, see the letter back ratio can be set to automatically deduct the
background and so on.

Routine software analysis procedure is as follows,
Find zero peak → Selection of measurement, measure and analyse→
Automatic peak search automatic attenuation → sample measurement standards → sample
measurement standards .

Содержание DW-TY-9900

Страница 1: ...manual DRAWELL INTERNATIONAL TECHNOLOGY LIMITED Chongqing Center Suite 2605 Building No 11 Shiyou Road No 1 Yuzhong District Chongqing China Tel 0086 023 63268643 Shanghai Office Suite 1101 Lane561 X...

Страница 2: ...iary Material Configuration 4 2 2 1 Stable Power Supply System 4 2 2 2 Power Requirements 4 2 2 3 Grounding Requirements 5 2 2 4 Gas Requirements 5 2 2 5 Cooling Water Requirements 5 2 2 6 Exhaust Req...

Страница 3: ...ucts include chemical reagents inorganic materials cosmetics oil gasoline diesel lubricating oil C5 and other synthetic gasoline raw materials oleic acid petroleum catalysts urea solutions 8 Food and...

Страница 4: ...nts to ensure the accuracy and sensitivity of the instrument 3 Small matrix effect 99 of the samples do not need to separate the matrix 4 Wide measurement range analysis from ultra micro to constant 5...

Страница 5: ...a generally the room temperature is required to be maintained at a fixed temperature between 25 3 and the temperature change should be less than 1 h If the ambient humidity is too high optical compone...

Страница 6: ...pply transformer Try not to share a power supply line with large motors large ventilators air conditioners muffle furnaces and other large electrical equipment In order to avoid large fluctuations in...

Страница 7: ...ng the smart cooling water tank add 35 liters of distilled or purified water to the PVC water tank of the cooling water tank 2 2 6 Exhaust Requirements The gas exhausted by the plasma chamber is mainl...

Страница 8: ...9900 ICP AES from left to right are main ICP power socket ground wire cooling water inlet and outlet two parts plasma gas and carrier gas inlets Fig 1 Fig 3 1 Schematic diagram of the installation po...

Страница 9: ...w direction it is open Plasma gas and carrier gas inlet in the picture they are respectively connected to the argon cylinder with a 6 PU tube through an oxygen pressure reducing regulator Fig 3 2 Circ...

Страница 10: ...her is the serial port for communication with the computer The power port is directly connected to the 220V power socket and the serial port needs to be connected to the RS232 interface on the back of...

Страница 11: ...Trainees should carefully read the operating instructions understand the functions of the various knobs of the instrument and be familiar with the operating methods and steps of the instrument and the...

Страница 12: ...ealing ring 2 Sets 1 big 2 small 9 Waste bottle 2 Pcs 10 Torch clamp 2 Pcs 11 Temperature controlled cooling circulating water tank 1 Set 12 Exhaust system 1 Set Axial Fan 13 Host power cord waterproo...

Страница 13: ...joint 4 Pcs 27 Direct connection 2 Pcs 6 28 Tee 2 Pcs 6 29 Argon cylinder pressure relief valve outlet connector 2 Pcs Stainless steel quick coupling with trachea 30 Copper plate copper rod and copper...

Страница 14: ...y scan change level of light to find zero light select the building method After the analysis of the capillary into the next measurement method of peak search of the standard peak active the looking f...

Страница 15: ...cts of the title bar shows the current method name the figure shows the ICP Analysis HG The second line is the menu bar A total of six drop down menu options daily use of measurement including three d...

Страница 16: ...15 In the new method enter the method name The following window appears determined...

Страница 17: ...16 OK displays the following window...

Страница 18: ...ach element needs its own standard input is enter the value you are prepared and STDHIGH STDLOW value your configuration or converted units completed in the daily analysis we need only follow the step...

Страница 19: ...18 attenuation measurement standards measure the sample Selection Method...

Страница 20: ...19 Double click or select the following points to determine Measurement automatic searching for peak peak with the preparation of standard solution actively look for a good looking peak...

Страница 21: ...20 Automatic peak search...

Страница 22: ...tenuation measurement in the analysis using standard solutions prepared from standard to high attenuation as shown below The first method requires the establishment of the future does not need automat...

Страница 23: ...22 Measurement standards in the analysis and measurement of the sample analysis sample to select multiple windows Testing standards...

Страница 24: ...23...

Страница 25: ...24 After you finish testing the standard point of exit to save Test sample...

Страница 26: ...25 Historical database free to choose to print to analyze data hold down the Ctrl key point to print the number...

Страница 27: ...26 Test results and historical data...

Страница 28: ...onals can make the sample case tracing the edit icon in the View view of spectrum The line spectrum is easily to identify whether the interference see the letter back ratio can be set to automatically...

Страница 29: ...nd that there is a lot of dirt at the nozzle or the center channel is blocked It needs to be used 1 1 acid soaking for 2 hours and then rinsed with pure water and dried 8 Whether the atomizer enters t...

Страница 30: ...g if the power is frequently on and the main control board is likely to burn if it rains and thunders 5 2 Precautions for Turn On Off Before turn on the measurement you need to make various preparatio...

Страница 31: ...on the working coil such as the torch the high voltage power supply must be turned off or the ICP power supply 2 When performing maintenance on the power box the operator must shut it down for 30 minu...

Страница 32: ...tactor is damaged or the auxiliary contact wiring is disconnected falling off etc Replace the contactor or restore the normal connection after finding the wiring fault High voltage cannot be turned on...

Страница 33: ...ite re ignite after preloading gas Air leakage at the junction of pipe and atomizer Tighten the connector if the atomizer is damaged contact the manufacturer for replacement Insufficient tube power Re...

Страница 34: ...pipe connecting the ICP and the water tank Open the ICP back shell Open the high frequency box and gradually remove the parts connected to the tube After changing the tube install it again Reconnect...

Отзывы: