background image

Section 10 -

 Installing Ceiling Closure

If unit is equipped with a ceiling closure system, use either as is, or in conjunction with a 

piece of existing ceiling tile.

1. 

If installing with ceiling tile, it may be necessary to cut tile so overall dimensions 

are same as 

(or slightly less than)

 closure panel. Place tile into trim frame. Lay closure 

panel on top 

(back side)

 of ceiling tile, and tighten screws to hold in place.

2. 

If installing large closure, attach brackets to bottom of projector plate. 

3. 

Attach 

5/16

(8mm)

 threaded rods to slots in projector plate or brackets.

 CAUTION:

  Ensure bolts and nuts attaching brackets to AeroLift are completely 

tightened.

4. 

Run unit "up" until bottom pan stops at highest position. Mark position on 

5/16

(8mm)

 

rods flush with ceiling level and cut rods to length 

(removing from pan if convenient)

.

5. 

Run unit "down" until bottom pan stops at "show" position.

6. 

Attach closure to lower end of 

5/16

(8mm)

 rods by slipping into four corner slots and 

secure with nuts above and below slots.

7. 

Run unit "up" again to highest position. Measure distance by which panel fails to 

reach required "closed" height for surrounding ceiling.

 CAUTION:

  Make sure nuts are completely tightened.

8. 

Run unit "down" then re-adjust mounting of 

5/16

(8mm)

 rods in traveling grid to raise 

panel required distance.

9. 

Test unit operation to confirm that panel will stop in closed position just before 

touching ceiling.

 CAUTION:

  DO NOT hang from, "ride," or pull down on unit. This could create a 

failure and cause damage and/or injury.

PLEASE NOTE:

 Immediately upon completing surrounding ceiling, operate unit to 

confirm that optional ceiling closure panel stops 

1/8

"

(3mm)

 short of ceiling in closed 

position. If closure panel touches ceiling, motor may continue operating after lift is 

closed. If it continues to cycle once lift is closed, a failure may occur, making unit 

descend rapidly and cause damage and/or injury.

Lower section of 

Environmental 

Air Space Housing

CEILING TILE 

(by others)

TRIM RING

Section 11 -

  Installing Ceiling Trim Kit 

(Optional)

1. 

Install  AeroLift  100 / 150.

2. 

Install bottom section of housing in opening by 

suspending with wire, or by mounting directly to the 

ceiling joists 

(if space permits)

.

3. 

Install projector and attach optional ceiling closure.

For Additional Safety:

1. 

Be sure the nuts that attach the threaded rods 

to the closure panel are tight. 

2. 

Wrap a plastic wire tie around the mounting tab 

and the threaded rod at all four corners of the  

closure panel.

 CAUTION:

  Do NOT use a paper-covered or 

similar wire tie — use only plastic wire ties for 

maximum safety.

page 8 of 8

AeroLift 100/150 220V

Содержание AeroLift 100 220V

Страница 1: ... to height of projector optional projector mounting bracket optional ceiling closure and optional Environmental Housing 3 Arrange to provide service access to the unit 4 When installed with Environmental Air Space Housing unit is suitable for use in an environmental air space in accordance with Section 300 22 C of the National Electrical Code and Section 2 128 12 010 3 and 12 100 of the Canadian E...

Страница 2: ...uthorized and qualified personnel who have been trained in its safe and effective operation and understand its safety features 21 The safety features of the unit should never be disabled bypassed or overridden The system should not be operated until all safety features are properly and completely installed calibrated and tested 22 Unit may need to comply with local state or district rules and regu...

Страница 3: ...e 3 Attach assembly to overhead structure Allow clearance between Environmental Air Space Housing top and structure for ease of future access 4 Install side and end panels and trim frame 8 10 6 7 1 5 6 3 1 6 5 8 9 2 4 2 5 6 5 6 11 13 14 12 Item Qty Part Number Description 1 4 C044 193SA Panel B Environmental Air Space Housing Side 2 4 C044 191SA Panel B Environmental Air Space Housing End 3 2 C044...

Страница 4: ... O D x 2mm 8 26 C020 112 Screw 8 32 X 3 8 10mm Type F HWH 9 1 C095 131SA Cover E Environmental Air Space Housing Top 10 1 C028 612 07SA Frame E Trim Ring 11 1 C028 611 01SA Frame E Environmental Air Space Housing Top 12 4 C020 313 Screw 3 8 10mm 16 x 1 25mm GR 5 Zinc Hex Head Cap 13 4 C013 024 Washer 3 8 10mm Flat 14 4 C018 044 NUT 3 8 10mm 16 Zinc Hex Keps 1 Attach Environmental Air Space Housing...

Страница 5: ... Draper universal mounts Section 4 Installing Projector If for any reason the hole placement must be changed completely lower AeroLift before attempting to drill holes When attaching projector bracket to plate make sure screws are short enough that they do not touch the motor roller above the plate when lift is closed Unit and projection system should be operated checked and adjusted as necessary ...

Страница 6: ...uld be made in accordance with wiring diagram AeroLift 100 150 should be operated and checked prior to installing projector and or optional ceiling closure Section 8 Wiring Diagrams IR Eye Input Low Voltage Trigger 4 28 VDC RS232 485 Inputs Outputs Receiver Button 3 Button Wall Switch DOWN Black COM White UP Red Wall Switch Electrically Straight Data Cable to more LVC IV modules A maximum of six 6...

Страница 7: ...clockwise will stop the AeroLift closer to the ceiling Turning it counter clockwise will cause the lift to stop at a lower point Adjusting Up CLOSED position Because the up closed position is preset at the factory Draper does not recommend changing this position using the limit switch The up position of the closure may be changed by changing the length of threaded rod If necessary however up posit...

Страница 8: ...it down then re adjust mounting of 5 16 8mm rods in traveling grid to raise panel required distance 9 Test unit operation to confirm that panel will stop in closed position just before touching ceiling CAUTION DO NOT hang from ride or pull down on unit This could create a failure and cause damage and or injury PLEASE NOTE Immediately upon completing surrounding ceiling operate unit to confirm that...

Отзывы: