PLEASE READ -
Safety Information
WARNING
Improper installation and use of the AeroLift 100 / 150 Projector Lift can result in serious injury or death. Primarily, injuries can occur when the unit falls due to
imprecise installation, mishandling of the unit during installation or installation on an insufficient wall or ceiling structure. Please use extreme care.
When using an electrical mounting system, basic precautions should always be followed, including the following: Please read the following installation guide-
lines thoroughly before using this mounting system. Failure to do so may cause product to fall or otherwise fail and could result in serious injury.
Please Note: An appropriate disconnect device shall be provided as part of the building installation. AeroLift must be installed in accordance with the require-
ments of Local Building Codes, Canadian Electrical Code
(CEC)
, CAN/CSA C22.1 and National Electric Code
(NEC)
, NFPA 70.
DANGER – To reduce the risk of electric shock:
1.
Remove power before cleaning.
WARNING – To reduce the risk of burns, fire, electric shock, or injury to
persons.
2.
Remove power before putting on or taking off parts.
3.
Use this mounting system only for its intended use as described in these
instructions. Do not use attachments not recommended by the manufacturer.
4.
If AeroLift mounting system is not working properly, call your dealer or Draper,
Inc.,
(765)
987-7999.
5.
Never operate the mounting system with the air openings blocked.
6.
Never drop or insert any object into any opening.
7.
Do not use outdoors.
8.
Installation and calibration of the unit should only be performed by an authorized,
qualified, and experienced professional. In particular, electrical work and wiring
[indicated in diagram by dashed lines] must be completed only by a qualified
professional electrician who has read this manual completely and is familiar with
the construction and operation of this equipment and the hazards involved.
9.
Do not affix the unit to walls or ceilings that have inadequate strength to
permanently hold the unit during use. It is the owner’s and installer’s responsibility
to confirm the wall or ceiling to which the unit attaches is sufficient to permanently
hold the weight and stress loads of the unit at all times. Draper
®
, Inc., is not
responsible for improper installation, application, testing or workmanship related
to the product at place of installation.
10.
It is the installer’s responsibility to make sure appropriate fasteners are used for
mounting. All hardware must be installed level. Unit must be level and square.
12.
Never leave the area while operating the unit during installation, maintenance, or
normal operation, unless it is secure and safe.
13.
Before testing or operation, carefully inspect the entire area and path
(especially
underneath)
of unit to be sure no persons or objects are in the area.
14.
Turn off power and any nearby equipment or cables carrying electricity before
connecting switches, wires, controls, or electrical components.
15.`
Make sure the limit switches are pointed down or accessible when placing the
motor in brackets.
16.
All motors should be tested and limits set using test cord before unit is wired.
17.
Do not wire motors in parallel without written permission from Draper, Inc.
18.
During testing or operation, carefully watch the surrounding area for any potential
safety concerns including nearby persons or objects.
19.
After installation, the entire system, including all sensors, should be carefully
tested to ensure safe and normal operation. Extreme care should be taken during
testing to remain clear of moving parts to avoid possible injury.
20.
Operation of unit should be performed only by authorized and qualified
personnel, who have been trained in its safe and effective operation and
understand its safety features.
21.
The safety features of the unit should never be disabled, bypassed or overridden.
The system should not be operated until all safety features are properly and
completely installed, calibrated and tested.
22.
Unit may need to comply with local, state, or district rules and regulations, in
particular when installed in schools. All applicable rules and regulations should be
reviewed before installation and use.
23.
Failure to precisely follow installation guidelines invalidates all warranties.
24.
Custom products/installations may not be reflected in this manual. Call Draper,
Inc., if you have questions about the installation of custom products or any
questions about your installation..
Before Beginning Installation
1.
Look for any job site conditions that could interfere with installation or operation
of the system.
2.
Read carefully and be sure to understand all installation instructions and all
related operations manuals. These instructions are intended to serve as a guide
for the installer and owner. They should be followed closely and combined with
the expertise of experienced qualified installers. Draper, Inc., is not responsible
for improper installation, application, testing or workmanship related to the
product at place of installation. Please retain all instructions for future use.
3.
Open cartons lengthwise.
4.
Locate and lay out all pieces.
5.
Inspect all boxes to make sure you have received the proper unit and parts.
Controls may be shipped separately, or in same carton as unit .
6.
If you have any difficulties with installing, servicing, or operating your unit , call
your dealer or Draper, Inc., 765-987-7999.
Important Safety Information
Important Safety Information
Section 1 -
Hanging Unit
TOP VIEW
TOP VIEW
SIDE VIEW
FRONT VIEW
AeroLift 100
(Relevant Mounting Dimensions)
SIDE VIEW
FRONT VIEW
AeroLift 150
(Relevant Mounting Dimensions)
28
"
(72.4cm)
28
"
(72.4cm)
14
"
(36cm)
10
"
(26.7cm)
26
"
(67.3cm)
5
"
(14.6cm)
14
"
(36cm)
31
"
(80cm)
31
"
(79.4cm)
27
"
(70cm)
14
"
(36cm)
15
"
(39.1cm)
11
"
(29.5cm)
14
"
(36cm)
29
"
(74.9cm)
6"
(15.2cm)
15
"
(38.7cm)
23
"
(59.4cm)
2
"
(6.2cm)
"
(1.9cm)
"
(1.9cm)
Mounting Bracket Detail
Top
Mounting
Hole
Side
Mounting
Slots
Anti-Slip
Slots
Top
Mounting
Hole
Side
Mounting
Slots
Anti-Slip
Slots
The AeroLift 100 / 150 ships with four
(4)
mounting angles for suspending the unit from above, or direct mounting from the sides. These angles provide up to 1½"
(38mm)
of adjustment
(front to back)
. The AeroLift 100 / 150 will fit between joists spaced 16"
(406mm)
apart on center
(assuming 2" joists)
, and will close approximately to 6"
(152mm)
,
not including the projector, bracket, or closure. The unit should be guy wired or blocked to prevent swinging. All installations should observe the following guidelines:
1.
Installer must ensure that all fasteners and supports are of adequate strength to securely support AeroLift 100 / 150 and projector. Hardware structure should hold
at least four times the combined weight of the lift, projector, housing, closure, and ceiling material attached to closure.
2,
Fastening methods must be suitable for mounting surface, and securely anchored so that vibration or abusive pulling on unit will not weaken installation.
3.
Bottom of unit must be unobstructed after
installation. Sufficient clearance must be allowed
below projector or optional ceiling closure.
4.
Do not use unit to support adjacent ceiling,
light fixtures, etc.
5.
Do not complete the ceiling below unit until
electrical connections have been completed
and unit has been operated successfully.
6.
Use slots on the projector plate and on the
closure to adjust the unit to ensure proper
alignment of ceiling closure relative to
ceiling opening.
CAUTION:
DO NOT hang from, "ride" or pull
down on the unit. This could create a failure and
cause damage and/or injury.
page 2 of 8
AeroLift 100/150 220V