background image

Section 3 -

 Installing Optional Environmental Air Space Housing for AeroLift 150

Please Note:

 Before assembling the housing, you will need to determine which assembly 

holes you will use, and knock them out.

The Environmental Air Space Housing is shipped unassembled, and must be assembled 

by the installer. The height of the Environmental Air Space Housing is set by punching 

out the knockouts at the desired locations then using screws to connect side panels. It is 

recommended when installing in a hard ceiling, to install an access panel for easy service or 

maintenance. The optional environmental air space housing must be installed to isolate the 

lift from the space designated for environmental air.

Item Qty Part Number

Description

1

4

C044.198SA

Panel, E Environmental Air Space Housing Side

2

4

C044.196SA

Panel, E Environmental Air Space Housing End

3

2

C044.197SA

Panel, E Environmental Air Space Housing Middle Side

4

2

C044.195SA

Panel, E Environmental Air Space Housing Middle End

5

28

C020.325

Screw, 8-32 X 

3/8

(10mm)

 Type 1 HWH

6

40

C018.051

Nut #8-32 Zinc Hex Keps

12  C013.070 

Washer, .188"  I.D. x .5" O.D. x .07" TK Nylon Flat 

(5mm I.D. x 13mm O.D. x 2mm)

 

8

26

C020.112

Screw, 8-32 X 

3/8

(10mm)

 Type F HWH

9

1

C095.131SA

Cover, E Environmental Air Space Housing Top

10

1

C028.612.07SA

Frame, E Trim Ring

11

1

C028.611.01SA

Frame, E Environmental Air Space Housing Top

12

4

C020.313

Screw 

3/8

(10mm)

 -16 x 1" 

(25mm)

 GR 5 Zinc Hex Head Cap

13

4

C013.024

Washer, 

3/8

(10mm)

 Flat

14

4

C018.044

NUT 

3/8

(10mm)

 -16 Zinc Hex Keps

1.  Attach Environmental Air Space Housing top frame to top of 

Lift with bolts provided.

2. 

Install top panel to Environmental Air Space Housing frame.

3. 

Attach assembly to overhead structure. Allow clearance 

between Environmental Air Space Housing top and 

structure for ease of future access.

4. 

Install side and end panels, and trim frame.

30

"

(76.9cm)

40

"

(103.7cm)

38

"

 (97.6cm)

27

"

(70.9cm)

30 

"

(76.8cm)

39 

"

(100.8cm)

5

"

(13.2cm)

16"

to 

36

"

(40.6 x 93cm)

40

"

(102.9cm)

Front/Back

View

Side

View

30 

"

(76.8cm)

EASH

25

"

(63.9cm)

25¾"

(65.4cm)

35

(90.6cm)

36¼"

 (92.1cm)

Trim 

Ring

Closure

Panel

40

(103.7cm)

30

"

(76.9cm)

30

"

 (76

cm

)

40½"

(102.9cm)

Lipless Closure Dims:

37

" x  27

(96.4 x  69.7cm)

27

(69

.2

cm

)

31

"

(80.6cm)

15"

(38.1cm)

Top View

EASH

30

"

(76.9cm)

40

"

(103.7cm)

38

"

 (97.6cm)

27

"

(70.9cm)

30 

"

(76.8cm)

39 

"

(100.8cm)

5

"

(13.2cm)

16"

to 

36

"

(40.6 x 93cm)

40

"

(102.9cm)

Front/Back

View

Side

View

30 

"

(76.8cm)

EASH

25

"

(63.9cm)

25¾"

(65.4cm)

35

(90.6cm)

36¼"

 (92.1cm)

Trim 

Ring

Closure

Panel

40

(103.7cm)

30

"

(76.9cm)

30

"

 (76

cm

)

40½"

(102.9cm)

Lipless Closure Dims:

37

" x  27

(96.4 x  69.7cm)

27

(69

.2

cm

)

31

"

(80.6cm)

15"

(38.1cm)

Top View

EASH

8

9

2

4

2

5

6

5

6

10

6 7

1

5 6

3

1

6 5

8

12

13

14

page 4 of 8

AeroLift 100/150 220V

Содержание AeroLift 100 220V

Страница 1: ... to height of projector optional projector mounting bracket optional ceiling closure and optional Environmental Housing 3 Arrange to provide service access to the unit 4 When installed with Environmental Air Space Housing unit is suitable for use in an environmental air space in accordance with Section 300 22 C of the National Electrical Code and Section 2 128 12 010 3 and 12 100 of the Canadian E...

Страница 2: ...uthorized and qualified personnel who have been trained in its safe and effective operation and understand its safety features 21 The safety features of the unit should never be disabled bypassed or overridden The system should not be operated until all safety features are properly and completely installed calibrated and tested 22 Unit may need to comply with local state or district rules and regu...

Страница 3: ...e 3 Attach assembly to overhead structure Allow clearance between Environmental Air Space Housing top and structure for ease of future access 4 Install side and end panels and trim frame 8 10 6 7 1 5 6 3 1 6 5 8 9 2 4 2 5 6 5 6 11 13 14 12 Item Qty Part Number Description 1 4 C044 193SA Panel B Environmental Air Space Housing Side 2 4 C044 191SA Panel B Environmental Air Space Housing End 3 2 C044...

Страница 4: ... O D x 2mm 8 26 C020 112 Screw 8 32 X 3 8 10mm Type F HWH 9 1 C095 131SA Cover E Environmental Air Space Housing Top 10 1 C028 612 07SA Frame E Trim Ring 11 1 C028 611 01SA Frame E Environmental Air Space Housing Top 12 4 C020 313 Screw 3 8 10mm 16 x 1 25mm GR 5 Zinc Hex Head Cap 13 4 C013 024 Washer 3 8 10mm Flat 14 4 C018 044 NUT 3 8 10mm 16 Zinc Hex Keps 1 Attach Environmental Air Space Housing...

Страница 5: ... Draper universal mounts Section 4 Installing Projector If for any reason the hole placement must be changed completely lower AeroLift before attempting to drill holes When attaching projector bracket to plate make sure screws are short enough that they do not touch the motor roller above the plate when lift is closed Unit and projection system should be operated checked and adjusted as necessary ...

Страница 6: ...uld be made in accordance with wiring diagram AeroLift 100 150 should be operated and checked prior to installing projector and or optional ceiling closure Section 8 Wiring Diagrams IR Eye Input Low Voltage Trigger 4 28 VDC RS232 485 Inputs Outputs Receiver Button 3 Button Wall Switch DOWN Black COM White UP Red Wall Switch Electrically Straight Data Cable to more LVC IV modules A maximum of six 6...

Страница 7: ...clockwise will stop the AeroLift closer to the ceiling Turning it counter clockwise will cause the lift to stop at a lower point Adjusting Up CLOSED position Because the up closed position is preset at the factory Draper does not recommend changing this position using the limit switch The up position of the closure may be changed by changing the length of threaded rod If necessary however up posit...

Страница 8: ...it down then re adjust mounting of 5 16 8mm rods in traveling grid to raise panel required distance 9 Test unit operation to confirm that panel will stop in closed position just before touching ceiling CAUTION DO NOT hang from ride or pull down on unit This could create a failure and cause damage and or injury PLEASE NOTE Immediately upon completing surrounding ceiling operate unit to confirm that...

Отзывы: