background image

Overview -

 Components 

(Aerolift 100 shown)

 CAUTION 

Read and understand all warnings 

(Page 2 of this document)

 before beginning installation.

Contents

Overview -

 Components, Planning .....................................................................1

Section 1 -

 Hanging Unit ......................................................................................2

PLEASE READ -

 Safety Information ....................................................................2

Section 2 -

 Environmental Air Space Housing for AeroLift 100 .....................3

Section 3 -

 Environmental Air Space Housing for AeroLift 150 .....................4

Section 4 -

 Installing Projector ...........................................................................5

Section 5 -

 Operation............................................................................................5

Section 6 -

 Testing Safety Limit Switches .........................................................5

Section 7 -

 Electrical Connections .....................................................................6

Section 8 -

 Wiring Diagrams ................................................................................6

Section 9 -

 Adjustments .......................................................................................7

Section 10 -

 Installing Ceiling Closure ...............................................................8

Closure Panel

Threaded 

Rod

Closure

Trim Frame

Front

Closure 

Bracket

Side

Closure 

Bracket

Side

Closure 

Bracket

Back

Closure 

Bracket

Overview -

 Planning

1. 

Based on screen location and projector 

specifications, determine proper position for 

projector installation.

2. 

Confirm that there is adequate space 

for installation and operation. Minimum 

clearance above ceiling level varies 

according to height of projector, optional 

projector mounting bracket, optional ceiling 

closure and optional Environmental Housing.

3. 

Arrange to provide service access to the unit.

4. 

When installed with Environmental Air Space 

Housing unit is suitable for use in an environmental 

air space in accordance with Section 300.22

(C)

 of 

the National Electrical Code, and Section 2-128, 

12-010

(3)

 and 12-100 of the Canadian Electrical 

Code, Part 1, CSA C22.1.

5. 

Total capacity of lift is 100 or 150 lbs, including 

closure, projector, and bracket.

As Soon As AeroLift 100 / 150 Arrives

1. 

Open carton and inspect for damage. 

2. 

Locate the following parts:

A. 

The unit itself

B. 

 Controls

C. 

 Any optional equipment

TOOLS REQUIRED

POWER DRILL

PENCIL

TAPE MEASURE

HARDWARE

 

(by others) 

LEVEL

PLIERS

HEX WRENCH

SCREWDRIVER

Draper, Inc.  |  411 S. Pearl St. Spiceland, IN 47385 

draperinc.com  |  765.987.7999  |  800.238.7999  

© 2020 All Rights Reserved 

FORM: AeroLift100_150_220V_Inst20

AeroLift 100/150 220V

Ceiling-recessed projector lift with a 100 lb

 (45kg) 

or 150 lb 

(68kg

) lifting capacity

INSTRUCTIONS

INSTALLATION & OPERATION

If you have any difficulties installing or servicing your  

AeroLift 100/150, call your dealer or Draper, Inc. 

Содержание AeroLift 100 220V

Страница 1: ... to height of projector optional projector mounting bracket optional ceiling closure and optional Environmental Housing 3 Arrange to provide service access to the unit 4 When installed with Environmental Air Space Housing unit is suitable for use in an environmental air space in accordance with Section 300 22 C of the National Electrical Code and Section 2 128 12 010 3 and 12 100 of the Canadian E...

Страница 2: ...uthorized and qualified personnel who have been trained in its safe and effective operation and understand its safety features 21 The safety features of the unit should never be disabled bypassed or overridden The system should not be operated until all safety features are properly and completely installed calibrated and tested 22 Unit may need to comply with local state or district rules and regu...

Страница 3: ...e 3 Attach assembly to overhead structure Allow clearance between Environmental Air Space Housing top and structure for ease of future access 4 Install side and end panels and trim frame 8 10 6 7 1 5 6 3 1 6 5 8 9 2 4 2 5 6 5 6 11 13 14 12 Item Qty Part Number Description 1 4 C044 193SA Panel B Environmental Air Space Housing Side 2 4 C044 191SA Panel B Environmental Air Space Housing End 3 2 C044...

Страница 4: ... O D x 2mm 8 26 C020 112 Screw 8 32 X 3 8 10mm Type F HWH 9 1 C095 131SA Cover E Environmental Air Space Housing Top 10 1 C028 612 07SA Frame E Trim Ring 11 1 C028 611 01SA Frame E Environmental Air Space Housing Top 12 4 C020 313 Screw 3 8 10mm 16 x 1 25mm GR 5 Zinc Hex Head Cap 13 4 C013 024 Washer 3 8 10mm Flat 14 4 C018 044 NUT 3 8 10mm 16 Zinc Hex Keps 1 Attach Environmental Air Space Housing...

Страница 5: ... Draper universal mounts Section 4 Installing Projector If for any reason the hole placement must be changed completely lower AeroLift before attempting to drill holes When attaching projector bracket to plate make sure screws are short enough that they do not touch the motor roller above the plate when lift is closed Unit and projection system should be operated checked and adjusted as necessary ...

Страница 6: ...uld be made in accordance with wiring diagram AeroLift 100 150 should be operated and checked prior to installing projector and or optional ceiling closure Section 8 Wiring Diagrams IR Eye Input Low Voltage Trigger 4 28 VDC RS232 485 Inputs Outputs Receiver Button 3 Button Wall Switch DOWN Black COM White UP Red Wall Switch Electrically Straight Data Cable to more LVC IV modules A maximum of six 6...

Страница 7: ...clockwise will stop the AeroLift closer to the ceiling Turning it counter clockwise will cause the lift to stop at a lower point Adjusting Up CLOSED position Because the up closed position is preset at the factory Draper does not recommend changing this position using the limit switch The up position of the closure may be changed by changing the length of threaded rod If necessary however up posit...

Страница 8: ...it down then re adjust mounting of 5 16 8mm rods in traveling grid to raise panel required distance 9 Test unit operation to confirm that panel will stop in closed position just before touching ceiling CAUTION DO NOT hang from ride or pull down on unit This could create a failure and cause damage and or injury PLEASE NOTE Immediately upon completing surrounding ceiling operate unit to confirm that...

Отзывы: