34
35
DIAGRAM OF A RESIDENTIAL INSTALLATION
DIFFERENT INSTALLATION POSSIBILITIES
On the top floor
(at the end of a pipeline)
On the first floor
(connected above a
pipeline under the floor)
On an intermediary floor
Always have a slight
inclination of the piping
towards the unit.
PIPING INSTALLATION
In the basement
(connected under a pipeline
under the floor)
Back-to-back
DIAGRAM OF A COMMERCIAL INSTALLATION
Installation example in series
Always have a slight inclination of the piping towards the unit.
Under the floor
Through the ceiling
PIPING INSTALLATION
Inclination
Inclination
Inclination
Содержание CYCLONIK DF1R11
Страница 1: ...CYCLONIK OWNER S MANUAL Central Vacuums ...
Страница 25: ...LIVR 03 PRINTED IN CANADA 05 18 Central Vacuums ...