30
31
INSTALLATION
INSTALLATION
Dust Inlet
Dust Inlet
Air Outlet
Air Outlet #1
Air Outlet #2
AIR OUTLET WITH A BOOSTER HEAD
In a parallel configuration, each head, including the main one, requires an independent
air outlet. A series configuration only requires one. However, the TETE200/TETE200E
head carries two air outlets.
Consult the booster head user’s guide for more information.
PARALLEL
CONFIGURATION
SERIES
CONFIGURATION
STEEL MUFFLER
Some units are equipped with a steel muffler to absorb the noise produced
by more powerful systems. Unlike plastic mufflers, this steel muffler must be
installed on the wall.
• You will find the installation method on the sheet provided with the exhaust.
Steel Muffler
Installation with a 90
o
elbow.