10
11
24’’ (60 cm)
24’’ (60 cm)
28’’ (70 cm)
10’’
(25 cm)
UNIT INSTALLATION
- FIRST THINGS FIRST -
WHERE TO INSTALL THE UNIT
We recommend installing the system on the
lowest level of the building
to avoid
having to work against gravity. Dust and solids will fall easier than being pulled
upwards, this is why the basement is generally the most ideal location. If there is no
basement, a storage room is equally suitable.
MINIMUM DIMENSIONS AND SPACING
It is important to install the unit in a location where it will be easily accessible for maintenance
and to effectively evacuate dust. The minimum spacing required is the following :
UNIT INSTALLATION
- FIRST THINGS FIRST -
REQUIRED TOOLS
Cutting Pliers
Measuring Tape
Phillips Screwdriver
Hole Saw
2.25” (57 mm)
Drill
0.5” (12.5 mm) bit
Mitre-Box and Saw
PVC Pipe Cutter
2” (50 mm)
Regular Screwdriver
or
or
5/16” Socket
Head Screwdriver