![Dr. Escherich AIFUN-CLEAN Spot 110 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/dr-escherich/aifun-clean-spot-110/aifun-clean-spot-110_operating-instructions-manual_2525971017.webp)
17
Operating Instructions for TAIFUN CLEAN
www.dr-escherich.com
Version 12/09
Fig. 4
7.3 Changing the Ionisation Systems
1. Release the attach screw(s) as shown in Fig. 4.
2. Pull out the rod carefully in the direction shown.
3. Replace with a new rod in the reverse order, when necessary, at least every
4 weeks
TAIFUN-CLEAN Compact / 140/ 180/ 240, Compact 140/180/240 AF
(Fig. 5 left):
Release the cable fastener.
Release the three attach screws as shown in Fig 5.
Pull out carefully the ring ionizer in the direction shown.
Remove the three attach bolts from the ring ionizer.
Replace with a new ring ionizer in the reverse order.
Fig. 5.
TAIFUN-CLEAN 014
TAIFUN-CLEAN 015
TAIFUN-CLEAN
Compact 140/180/240
(Compact 140/180/240 UL analogue)
TAIFUN-CLEAN
Spot 80, Spot 110, Compact 110