8
01.00
Operation
DESCRIPTION OF OPERATING ELEMENTS
3
1
PUTTING INTO OPERATION
●
Open the water cock.
●
Open the dispenser door and switch
the power switch (1) to position "I".
(Fig. 3)
3 Delivery button/hot water: (Fig. 1)
Delivery of hot water by pressing the
push button.
4 Delivery buttons for product delivery
on left/right-hand side: (Fig. 1) Delivery
of hot products by pressing the push
buttons.
Note:
Only one beverage can be delivered at
the same time.
Either the left product, the right product
or hot water.
13 Power switch (Fig. 2)
I = all functions ON
0 = all functions OFF (except cooling)
1 Display "ready for operation" (Fig. 1)
Lights as soon as the dispenser is
ready for operation. Connected to the
power supply (power switch switched
to "I" and dispenser door closed).
2 Concentrate pack - empty indicators:
(Fig. 1)
Light off
= ready for operation
Lights red
= Concentrate pack of
the unit empty.
Delivery stopped.
Replace the pack.
Both flash
= Indicates a malfunction.
Delivery stopped.
Call the service.
Содержание CAFITESSE 300
Страница 1: ...OPERATING INSTRUCTIONS CAFITESSE 300 B 2224 Press Press ...
Страница 2: ......
Страница 4: ...2 01 00 ...