Engine Reassembly
- 96 -
3.3.30. Turbo charger
z
Attach a gasket to the exhaust elbow
and assemble the turbocharger with
fixing bolts.
z
Install the connecting pipes and an
O-ring between the inlet flange and
turbocharger Then, it is assembled with
the O-ring that was coated with engine
oil.
z
Attach a gasket on the oil supply pipe
and assemble the pipe with the fixing
bolts.
z
Attack a gasket on the oil discharge
pipe and assemble the pipe by
tightening the bolts.
z
At the same method as above, both
sides are assembled.
3.3.31. Intake stake
z
Connect rubber hoses between the
intake stake and turbocharger and
assemble by tightening clamps.
3.3.32. Fuel injection pipe
z
Connect the fuel injection pipes to the
fuel injection pump and the nozzle
respectively and then assemble them
by tightening nuts.
z
Assemble the fuel return pipes by
tightening fixing nuts.
EFM2086I
EFM2087I
Содержание P158LE -III
Страница 160: ...Appendix 157 1 P158LE Generator engine assembly EH5OM013 ...
Страница 161: ...Appendix 158 2 P180LE Generator engine assembly EH5OM014 ...
Страница 162: ...Appendix 159 3 P222LE Generator engine assembly EH5OM015 ...
Страница 163: ...Appendix 160 4 PU158TI Power unit engine assembly EH5OM016 ...
Страница 164: ...Appendix 161 5 PU180TI Power unit engine assembly EH5OM017 ...
Страница 165: ...Appendix 162 6 PU222TI Power unit engine assembly EH5OM018 ...