Alternative Operation
(
basic)
After scheduled operating or
when all of the
pump
s
stop,
the master pump will
alternatively change
-
Alternative method
means all of the pumps will run
sequently.
-
If all
of the
pump
s
stop and then reopertate,
the master pump changes from pump one to
pump 2
-
After
passing the time of the
Pr-54 (
lead pump alternation time
:
Factory setting
12hour)
,
second pump will operate by force
Fixed Lead Pump Operation
In case
the location is in demand of high water
consumption or
a location
where the pump need
s
to
maintain
contstant pressure.
-
If
Pr-54 (
lead pump alternation time
)
is
set
at
"0", the first pump
will
operate as lead pump
-
The l
ead pump do
es not
altenate, o
and will operate
sequently.
Method by Intergrated Current Rate
To operate by distributing
the current
evenly after calculating the intergrated
current from each controllers.
-
If
Pr-53 (
Alternation Type
)
is
set
at
"1",
the pump with the lowest amount of
current consumed will operate.
ALL PID
Method
Main controller control
s
all of
the
drive
s
via
PID
If
Pr-61(
PID control type setup
)
is
set
at
"1", this function will be applied.
Operation Method
Содержание NSQ Series
Страница 1: ...NSQP HNSQP BOOSTER PUMP SYSTEM PREMIUM...
Страница 2: ......