RF Baghouse, Models RFT, RFW, and RFWH
10
High Inlet Installation
1. After the collector housing is upright and secure,
remove the braces from the high inlet opening on
the collector.
2. Place 1/4-in diameter, rope-type sealant toward the
inside and outside edge of the bolt pattern in a figure
8 pattern on the inlet section mounting flanges.
3. Lift high inlet into position and secure with the
hardware provided.
sealant
high inlet
mounting
flange
high inlet
High Inlet Installation