RF Baghouse, Models RFT, RFW, and RFWH
8
Section Assembly
1. Reference the Specification Control Drawing for
inlet and outlet orientation.
2. Apply 1/4-in diameter, rope-type sealant to the
hopper’s top flange.
3. Lift the inlet section into position over the hopper and
lower slowly. Temporary eye bolts (not provided)
may be used for lifting. Ensure enough bolts are
used for stability depending on grade of bolt and
angle of lift.
4. Use drift pins to align holes in the section flanges
and secure using the hardware provided.
5. Repeat Steps 2 through 4 to install the filter section
and clean-air plenum.
Provisional Anchor Bolt Recommendations
1. Consider Hilti HIT-HY 200 Anchor System or
equivalent. Quantity of anchor bolts should match the
number of holes provided in the base plates.
2. Anchor diameter is typically 1/8 to 1/2-in less than
baseplate hole diameter.
3. Corrosive environment or outdoor installation may
require stainless steel anchors.
sealant
flange
clean-air plenum
RFT
clean-air plenum
RFW/RFWH
inlet section
filter section
Section Assembly (Knock-Down Version Shown)
Typical Foundation Anchor
Anchor should project a
minimum of 1 3/4-in and
account for nut, washer,
base plate and shims/
grout.
Embedment depth
(suitable for the
physical properties of
the foundation).