Donaldson Company, Inc.
20
hopper
fluid
head
union
pipe plug
NPT pipe
P-Trap Installation
CAUTION!
Ensure collected material properly flows
through the P-trap. Improperly operating
P-trap may result in propery damage.
P-Trap Installation
Note:
Ensure P-trap is designed with sufficient
fluid head to overcome blower static
capabilities. An incorrectly sized P-trap
will result in coolant pooling within the
inlet plenum.
1. Install the P-trap as shown in P-Trap
Installation.
2. Position the P-trap outlet to the proper location
and tighten the union.
3. Plumb the P-trap to a receptacle or install a
return line back to the machine center.
4. Fill P-trap before starting unit.
Note:
The characteristics of some machining
fluids change with time, use, and
exposure to air. Check the condition of
the collected fluid before re-using.
Содержание WSO 10
Страница 1: ...IOM AK0300601 Revision 2...
Страница 9: ...WSO 10 15 and 20 9 This Page Intentionally Left Blank...
Страница 15: ...WSO 10 15 and 20 15 This Page Intentionally Left Blank...
Страница 24: ......
Страница 27: ...WSO 10 15 and 20 27 This Page Intentionally Left Blank...
Страница 35: ...WSO 10 15 and 20 35 e t a D d e m r o f r e P e c i v r e S s e t o N Service Notes...
Страница 36: ...Donaldson Company Inc 36 Service Notes continued e t a D d e m r o f r e P e c i v r e S s e t o N...
Страница 37: ...This Page Intentionally Left Blank...
Страница 38: ...This Page Intentionally Left Blank...
Страница 39: ......