Flush Mount Installation
The flush mount option is for installing a collector
on a machine center that has a large flat
unobstructed top surface.
1. Open the units access door and remove the
primary and first stage filters.
2. Remove the filter retention system.
3. Layout and drill bolt hole pattern into the top
of machine center (refer to Specification Control
drawing for bolt size and pattern).
Note:
Alternative option is to trace bolt hole
pattern directly onto machine center.
4. Cut opening into machine center and drill
mounting holes.
5. Apply generous amounts of sealant to the
outside perimeter of the bolt pattern on the
machine center.
6. Carefully lift unit into position over the
machine center and lower into position.
7. Install and tighten fasteners into every hole.
8. Install filter retention system and filters.
sealant
bolt
Flush Mount Installation, WSO 15 shown
Flanged Inlet Hopper Installation
This flanged inlet hopper option is for installing a
collector on a machine center that has a limited
amount of unobstructed top surface.
1. Open the units access door and remove the
primary and first stage filters.
2. Remove the filter retention system.
3. Carefully lift unit into position over the
machine center and lower into position.
4. Trace bolt pattern onto the machine center or
match drill pattern.
5. Cut opening into machine center and drill
mounting holes.
6. Move the unit aside and apply generous
amounts of sealant to the outside perimeter of
the bolt pattern on the machine center.
7. Carefully position unit over the bolt pattern and
lower into position.
8. Install and tighten fasteners into every hole.
9. Install filter retention system and filters.
bolt
washer
sealant
Flanged Inlet Hopper Installation, WSO 15 shown
Содержание WSO 10
Страница 1: ...IOM AK0300601 Revision 2...
Страница 9: ...WSO 10 15 and 20 9 This Page Intentionally Left Blank...
Страница 15: ...WSO 10 15 and 20 15 This Page Intentionally Left Blank...
Страница 24: ......
Страница 27: ...WSO 10 15 and 20 27 This Page Intentionally Left Blank...
Страница 35: ...WSO 10 15 and 20 35 e t a D d e m r o f r e P e c i v r e S s e t o N Service Notes...
Страница 36: ...Donaldson Company Inc 36 Service Notes continued e t a D d e m r o f r e P e c i v r e S s e t o N...
Страница 37: ...This Page Intentionally Left Blank...
Страница 38: ...This Page Intentionally Left Blank...
Страница 39: ......